<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2015-1148</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2380817&amp;GUID=27800743-EB86-48FD-8C56-E0345B5C31E7</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?GUID=27800743-EB86-48FD-8C56-E0345B5C31E7&amp;ID=2380817&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2015-1148</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2380817&amp;GUID=27800743-EB86-48FD-8C56-E0345B5C31E7</link><guid isPermaLink="false">27800743-EB86-48FD-8C56-E0345B5C31E7-2025-06-09-05-08-18</guid><description>Title: CONSIDER Motion by Directors Dupont-Walker and Solis that the Board instruct the CEO to:

A.	direct staff to establish a design advisory working group that includes representatives from the following entities:

1.	Metro Operations

2.	Metro Construction

3.	Metro Arts

4.	Metro Planning

5.	MOW Design-Build Team 

6.	City of Los Angeles 6th Street Bridge Design-Build Team

7.	Arts District Community

B.	direct staff to report back to the board on a monthly basis on progress that is made with the advisory group to explore the following objectives:	

1.	Site placement of the MOW Facility is placed the farthest distance from Santa Fe as allowed by operational functionality and applicable building codes.

2.	Parking on the site is optimized

3.	Adoption of architectural design that reflects Metro’s most recent efforts

C.	direct staff to report back in 60 days with a detailed outreach and engagement process for incorporating art into the Maintenance of Way Facility including the following elements:

1.	Forming a selection panel including Downtown-based art pro</description><pubDate>Mon, 09 Jun 2025 05:08:18 GMT</pubDate></item></channel></rss>