<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2017-0121</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2987211&amp;GUID=74576D3D-EC5F-457A-96B1-AED8712D6074</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?GUID=74576D3D-EC5F-457A-96B1-AED8712D6074&amp;ID=2987211&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2017-0121</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2987211&amp;GUID=74576D3D-EC5F-457A-96B1-AED8712D6074</link><guid isPermaLink="false">74576D3D-EC5F-457A-96B1-AED8712D6074-2025-06-09-06-23-17</guid><description>Title: CONSIDER:

A.	APPROVING the recommended Alternative 2 with six Regional Rail run-through tracks and two High Speed Rail run-through tracks (also referred to as “6+2 Run Through Tracks” Alternative) to be carried forward in the California Environmental Quality Act (CEQA) Draft Environmental Impact Report (EIR) and National Environmental Policy Act (NEPA) Draft Environment Impact Statement (EIS) and continue to evaluate Alternatives 1, 3 and 4 as reasonable alternatives in the Draft EIR/EIS;

B.	AUTHORIZING the Chief Executive Officer (CEO) to execute Modification No. 4 to Contract No. PS2415-3172, with HDR Engineering, Inc., for Link Union Station (Link US) to provide advanced engineering for the run-through tracks and environmental and preliminary engineering services for the expansion of Link US to connect the Link US project with Patsaouras Transit Plaza to the east and the historic Union Station to the west, increasing the total contract value by $13,761,273, from $48,279,357 to a not to exceed amount of $62,040,630; 

C.	AUTHORIZING the CEO to increase Contract Modification Autho</description><pubDate>Mon, 09 Jun 2025 06:23:17 GMT</pubDate></item></channel></rss>