<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2016-0284</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2860966&amp;GUID=98E55990-1E6D-4638-9468-CA7652172BA2</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?GUID=98E55990-1E6D-4638-9468-CA7652172BA2&amp;ID=2860966&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2016-0284</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2860966&amp;GUID=98E55990-1E6D-4638-9468-CA7652172BA2</link><guid isPermaLink="false">98E55990-1E6D-4638-9468-CA7652172BA2-2025-06-09-05-08-26</guid><description>Title: AUTHORIZE the Chief Executive Officer (CEO) to:

A.	CONDUCT a study for providing up to two additional stations in the City of Glendale and up to two additional stations in the City of Los Angeles as well as providing increased train service throughout the day from Union Station to the City of Burbank with opportunities to include expanded service to the Antelope Valley as a first step in examining increased rail connectivity in the Los Angeles, Glendale and Burbank Corridor.  Additional stations would need to be spaced appropriately and limited so as not to severely affect travel time for those travelling beyond Burbank to the outer terminus of the lines in Ventura and the Antelope Valley;

B.	PROGRAM AND AMEND the FY 17 budget to add $900,000 in Measure R Commuter Rail service funds to conduct this study; and

C.	INVENTORY the options for increasing the City of Glendale’s access to the Regional Transit System given the existing baseline Metrolink and future High Speed Rail service.  This inventory will examine the existing infrastructure, planned and funded projects and poten</description><pubDate>Mon, 09 Jun 2025 05:08:26 GMT</pubDate></item></channel></rss>