Meeting_Body
CONSTRUCTION COMMITTEE
JUNE 18, 2015
Subject/Action
SUBJECT: BRIGHTON TO ROXFORD DOUBLE TRACK PROJECT
ACTION: APPROVE CONTRACT FOR THE BRIGHTON TO ROXFORD DOUBLE TRACK PROJECT
Heading
RECOMMENDATION
Title
WITHDRAWN: authorizing the Chief Executive Officer to execute a cost-plus-fixed-fee Contract No. PS2415-3412 with STV, Inc. for the Brighton to Roxford Double Track Project in the amount of $12,500,000 $13,594,016, inclusive of all design phases. This contract is for three years.
Issue
ISSUE
It is the intent of Metro Regional Rail to award a professional services contract to provide engineering services for completion of the environmental clearance documents, preliminary engineering documents, permitting, and final design engineering of the Brighton to Roxford Double Track Project. In addition the work includes the development of the necessary construction documents for the Project, as well as design support services during bid and construction.
Discussion
DISCUSSION
Background
Metro is developing the Brighton to Roxford Double Track project (Project) in Los Angeles, CA, between milepost (MP) 12.7 and MP 2 3.6 on the Valley Subdivision. At this time, Metro is proceeding with the environmental clearance and the development of Plans, Specifications, and Estimates (PS&E) for construction of the Project.
The Project includes approximately 10.4 miles of new double track beginning at Control Point (CP) Brighton, at MP 12.7, and ending at CP Roxford, at MP 23.6 on the Valley Subdivision of the Antelope Valley Line. At the east end of the Project near CP Brighton, the scope of work includes connecting the new double track to the Brighton Siding extension that is being developed as part of the Empire Avenue and Buena Vista Grade Separation Project. The scope of work also includes connection to the 6,109 foot existing Sun Valley Siding between CP McGinley and CP Sheldon. In addition, this Project includes co...
Click here for full text