<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2015-1593</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2517892&amp;GUID=792AF948-D4F6-4C38-9ADA-0446F270B963&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94&amp;GUID=792AF948-D4F6-4C38-9ADA-0446F270B963&amp;ID=2517892&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2015-1593</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2517892&amp;GUID=792AF948-D4F6-4C38-9ADA-0446F270B963&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><guid isPermaLink="false">792AF948-D4F6-4C38-9ADA-0446F270B963-2025-06-09-05-08-20</guid><description>Title: A.	FINDING that utilizing design-build delivery  pursuant to Public Utilities Code (“PUC”) Section 130242 will achieve private sector efficiencies in the integration of the design, project work, and components related to the construction and installation of new roofs at Divisions 11 and 22 to later enable the installation of solar photovoltaic (“PV”) systems at Divisions 9, 11, 22 and the Expo Yard;

(REQUIRES TWO-THIRDS VOTE)

B.	AUTHORIZING the Chief Executive Officer to solicit a design-build contract for design, construction and installation of new roofs for Divisions 11 and 22,  pursuant to PUC Section 130242 

C.	INCREASING the Life of Project Budget for the Lighting Retrofit at two Rail Divisions project (CP#204801) from $1,557,000 by $2,648,100 to include design and construction of new roofs for Divisions 11 and 22; the new LOP amount will be $4,205,100.</description><pubDate>Mon, 09 Jun 2025 05:08:20 GMT</pubDate></item></channel></rss>