<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2016-0002</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2602777&amp;GUID=8954C90B-8E6A-4F25-B4FE-94487CE58EEF&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94&amp;GUID=8954C90B-8E6A-4F25-B4FE-94487CE58EEF&amp;ID=2602777&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2016-0002</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2602777&amp;GUID=8954C90B-8E6A-4F25-B4FE-94487CE58EEF&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><guid isPermaLink="false">8954C90B-8E6A-4F25-B4FE-94487CE58EEF-2025-06-09-05-08-23</guid><description>Title: AUTHORIZE the Chief Executive Officer (CEO) to execute:

A.	Modification No. 3 to Contract No. PS2415-3172 for Southern California Regional Interconnector Project (SCRIP) with HDR, Engineering, Inc. to provide environmental and preliminary engineering services for the expansion of SCRIP to include the Los Angeles Union Station Master Plan passenger concourse and accommodate high speed rail (HSR), increasing the total contract value by $17,641,953, from $30,637,404 to a not to exceed amount of $48,279,357; and

B.	an Agreement with the California State High Speed Rail Authority (CHSRA) up to a maximum amount of $15 million for SCRIP for the accommodation of HSR.</description><pubDate>Mon, 09 Jun 2025 05:08:23 GMT</pubDate></item></channel></rss>