<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2015-1480</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2461952&amp;GUID=89F55902-3878-4139-BED0-22C7BB5682C5&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94&amp;GUID=89F55902-3878-4139-BED0-22C7BB5682C5&amp;ID=2461952&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2015-1480</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2461952&amp;GUID=89F55902-3878-4139-BED0-22C7BB5682C5&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><guid isPermaLink="false">89F55902-3878-4139-BED0-22C7BB5682C5-2025-06-09-05-08-20</guid><description>Title: MOTION by Fasana that staff report back to the System Safety, Security and Operations Committee in 60 days with the following information:

A.	Usage data of the current APT system, including the average wait during peak times and the total daily usage;

B.	How to best determine the restroom usage and capacity needs, both near and long term;

C.	The feasibility of adding additional restrooms at the station either via APT’s, stand-alone restrooms, retail opportunities, or other ideas;

D.	Cost estimates for addition of additional restrooms and potential locations, and;

E.	Timelines for installing additional restrooms.</description><pubDate>Mon, 09 Jun 2025 05:08:20 GMT</pubDate></item></channel></rss>