<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2015-1716</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2750503&amp;GUID=C772D3E6-D71D-4DD8-BABD-B6A86C65434E&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94&amp;GUID=C772D3E6-D71D-4DD8-BABD-B6A86C65434E&amp;ID=2750503&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2015-1716</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2750503&amp;GUID=C772D3E6-D71D-4DD8-BABD-B6A86C65434E&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><guid isPermaLink="false">C772D3E6-D71D-4DD8-BABD-B6A86C65434E-2025-06-09-05-08-21</guid><description>Title: CONSIDER:

A.	AUTHORIZING the Chief Executive Officer (CEO) to issue a Modification to Contract No. C0988 with Walsh/Shea Corridor Constructors (WSCC), to begin construction on accommodations so as not to preclude a future Light Rail Transit (LRT) Station at 96th Street, Airport Metro Connector (AMC), in an amount not to exceed $7,400,000 increasing the total contract value from $1,294,476,149.38 to $1,301,876,149.38; and  

B.	APPROVING an increase in Contract Modification Authority (CMA) for Contract No. C0988 in the amount of $7,400,000 increasing the total CMA from $134,699,993 to $142,099,993.</description><pubDate>Mon, 09 Jun 2025 05:08:21 GMT</pubDate></item></channel></rss>