<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2016-0852</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2865401&amp;GUID=D7E300BC-C008-4227-B6B9-109C2D6C59E8&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94&amp;GUID=D7E300BC-C008-4227-B6B9-109C2D6C59E8&amp;ID=2865401&amp;M=LD" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2016-0852</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=2865401&amp;GUID=D7E300BC-C008-4227-B6B9-109C2D6C59E8&amp;G=A5FAA737-A54D-4A6C-B1E8-FF70F765FA94</link><guid isPermaLink="false">D7E300BC-C008-4227-B6B9-109C2D6C59E8-2025-06-09-05-08-30</guid><description>Title: APPROVE Motion by Directors Garcetti, Krekorian and Antonovich that the Board direct the CEO to report back on the following:

A.	Develop an implementation plan to use all electric buses for the Orange Line Bus Rapid Transit Line by 2020. The plan shall include, but not limited to, the following:
1.	Total cost of electrification 
2.	Eligible funding sources to address the costs
3.	Federal and State grant opportunities
4.	A schedule and transition plan

B.	Report back on the feasibility to use all electric buses for the Silver Line. The report shall include, but not be limited to, the following:
1.	Type of electric bus
2.	Range requirements
3.	Charging and infrastructure needs
4.	A recommended schedule and transition plan</description><pubDate>Mon, 09 Jun 2025 05:08:30 GMT</pubDate></item></channel></rss>