<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Metro - File #: 2019-0280</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3937434&amp;GUID=29F7C442-B9E9-4DC4-8454-A671E660F13D</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://metro.legistar.com/Feed.ashx?M=LD&amp;ID=3937434&amp;GUID=29F7C442-B9E9-4DC4-8454-A671E660F13D" rel="self" type="application/atom+xml" /><item><title>Metro - File #: 2019-0280</title><link>https://metro.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=3937434&amp;GUID=29F7C442-B9E9-4DC4-8454-A671E660F13D</link><guid isPermaLink="false">29F7C442-B9E9-4DC4-8454-A671E660F13D-2025-06-09-06-23-38</guid><description>Title: CONSIDER:

A.	RECEIVING AND FILING the North Hollywood to Pasadena BRT Corridor Alternatives Analysis (AA) Study Report; 

B.	AUTHORIZING the CEO to initiate the Draft Environmental Impact Report (DEIR); and 

C.	DIRECTING staff to study, as part of the EIR, the feasibility of dedicated bus lanes between the North Hollywood Station and Metro Gold Line, and the extension of BRT service in mixed flow traffic lanes from the Metro Gold Line to Pasadena City College.

(CARRIED OVER FROM APRIL)</description><pubDate>Mon, 09 Jun 2025 06:23:38 GMT</pubDate></item></channel></rss>