File #: 2017-0649   
Type: Motion / Motion Response Status: Agenda Ready
File created: 9/20/2017 In control: Board of Directors - Regular Board Meeting
On agenda: 9/28/2017 Final action:
Title: WE THEREFORE MOVE that the Board direct the CEO and the Regional Rail Unit to: A. Adjust the scope of the proposed San Bernardino Line Strategic Study to evaluate the benefits and/or impacts related to removing the Metrolink Claremont Station. At a minimum, the study shall provide a comprehensive understanding of the following: 1. Current and projected ridership growth under existing conditions; 2. Total parking spaces and current parking utilization rate at all co-located stations; 3. Impacts and potential mitigations to Metrolink riders that currently board at the Claremont station; 4. Impacts to Metrolink operations and travel times; 5. Cost savings associated with the construction of the Gold Line Phase 2B; 6. Impacts and potential mitigations to the City of Claremont if it becomes the Gold Line terminus with and without a Metrolink Station scenario. 7. Analysis of when Metrolink service would be discontinued in Claremont during Gold Line construction, and length of time during ...
Sponsors: Board of Directors - Regular Board Meeting
Indexes: Ara Najarian, Claremont, Construction, Gold Line Foothill Extension 2B, Hilda Solis, John Fasana?, Kathryn Barger, Metro Gold Line, Metro Rail A Line, Metro Rail L Line, Metrolink, Metrolink San Bernardino Line, Mitigation, Motion / Motion Response, Pomona
Related files: 2017-0525, 2017-0836
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.
Meeting_Body
REGULAR BOARD MEETING
SEPTEMBER 28, 2017

Preamble
Motion by:

SOLIS, BARGER, FASANA AND NAJARIAN

September 28, 2017

Relating to Item 21, File ID 2017-0525
Claremont Gold Line & Metrolink Shared Station

The Foothill Gold Line and the Metrolink San Bernardino Line include three co-located Metrolink and Gold Line Stations - North Pomona, Claremont and Montclair - within a couple miles of each other. Construction of the Gold Line requires demolition of the existing Claremont Metrolink station and rebuilding a new one, which then presents the option of forgoing the Claremont Metrolink station altogether. This option offers a shorter commute time on the Metrolink San Bernardino Line while the Gold Line provides more frequent light rail service and would reduce construction costs for the Gold Line extension.

A decision to maintain or remove the Metrolink station in the City of Claremont is critically urgent to avoid delays and cost overruns associated with construction of the Foothill Gold Line Phase 2B extension to Claremont / Montclair.

Subject
SUBJECT: MOTION BY SOLIS, BARGER, FASANA AND NAJARIAN
Heading
SAN BERNARDINO LINE STRATEGIC STUDY
Title
WE THEREFORE MOVE that the Board direct the CEO and the Regional Rail Unit to:

A. Adjust the scope of the proposed San Bernardino Line Strategic Study to evaluate the benefits and/or impacts related to removing the Metrolink Claremont Station. At a minimum, the study shall provide a comprehensive understanding of the following:
1. Current and projected ridership growth under existing conditions;
2. Total parking spaces and current parking utilization rate at all co-located stations;
3. Impacts and potential mitigations to Metrolink riders that currently board at the Claremont station;
4. Impacts to Metrolink operations and travel times;
5. Cost savings associated with the construction of the Gold Line Phase 2B;
6. Impacts and potential mitigations to the City of Claremont if it becomes the Gold L...

Click here for full text