File #: 2018-0710   
Type: Motion / Motion Response Status: Agenda Ready
File created: 10/29/2018 In control: Operations, Safety, and Customer Experience Committee
On agenda: 11/15/2018 Final action:
Title: CONSIDER: A. APPROVING Alternative C-1 (Norwalk - Crenshaw/Expo, and Redondo Beach - Aviation/Century) as the preferred service plan for Crenshaw/LAX - Green Line; and B. DIRECTING the CEO to reevaluate the service plan one year prior to the opening of the Green Line extension to Torrance to determine if travel patterns and other relevant factors show a need for a change in service pattern.
Sponsors: Operations, Safety, and Customer Experience Commit
Indexes: 7th Street/Metro Center Station, Airport Metro Connector (AMC) Station Project, Alignment, Aviation/LAX Station, Azusa, Baldwin Hills, Board approved a Motion, C Line (Green) Extension to Torrance, City of Los Angeles, Council Of Governments, Crenshaw District, Crenshaw Northern Extension, Crenshaw Station, Crenshaw/LAX Transit Corridor Project, Division 16, Downtown Inglewood Station, El Segundo, Expo/Crenshaw Station, Gateway Cities (Southeast LA County) Service Council, Gateway Cities (Southeast LA County) Service Sector, Gateway Cities subregion, Gold Line Foothill Extension 2A, Harbor Freeway Station, I-105, I-405, Inglewood, James Butts, Janice Hahn, John Fasana?, LADOT Transit, Light rail transit, Los Angeles International Airport, Maintenance, Maintenance of way, Metro Blue Line, Metro Crenshaw Line, Metro Exposition Line, Metro Gold Line, Metro Green Line, Metro Rail A Line, Metro Rail C Line, Metro Rail E Line, Metro Rail K Line, Metro Vision 2028 Plan, Minutes, Motion / Motion Response, Norwalk, Norwalk El Segundo Transit Project, Norwalk Station, Operating revenues, Outreach, Pasadena, Peak periods, Pico Station, Plan, Procurement, Redondo Beach, Redondo Beach Station - North, Redondo Beach Station - South, Ridership, Security, Sierra Madre Villa Station, South Bay Cities subregion, South Bay Service Council, South Bay Service Sector, South Bay Subregion Council of Governments, Station 0820, Station 0824, Strategic planning, Terminal 27, Terminals (Communications), Testing, Torrance, Torrance Transit Park and Ride Regional Terminal, Traction, Transfers, Travel patterns, Westchester, Westchester/Veterans Station, Westside Cities subregion, Westside/Central Service Sector, Willowbrook/Rosa Parks Station
Attachments: 1. Attachment A - Motion 40.1, 2. Attachment B - Crenshaw_LAX Green Line Alternative Service Plan Evaluation, 3. Attachment C - Comparison of Final 6 Operating Alternatives, 4. Presentation
Related files: 2018-0784
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.

Meeting_Body

OPERATIONS, SAFETY, AND CUSTOMER EXPERIENCE COMMITTEE

NOVEMBER 15, 2018

 

Subject

SUBJECT:   CRENSHAW/LAX - GREEN LINE OPERATING PLAN

Action

ACTION:                     APPROVE RECOMMENDATION

 

Heading

RECOMMENDATION

 

Title

CONSIDER:

 

A.                     APPROVING Alternative C-1 (Norwalk - Crenshaw/Expo, and Redondo Beach - Aviation/Century) as the preferred service plan for Crenshaw/LAX - Green Line; and

 

B.                     DIRECTING the CEO to reevaluate the service plan one year prior to the opening of the Green Line extension to Torrance to determine if travel patterns and other relevant factors show a need for a change in service pattern.

 

Issue

ISSUE

 

On June 28, 2018, the Board of Directors (Board) approved Motion 40.1 by Directors Hahn, Butts, and Fasana (Attachment A), requesting staff to:

 

                     Expand ridership estimates to include projected Green Line extension to Torrance;

 

                     Add a third scenario that gives both ends of the Green Line a one-seat ride to the Expo Line; and

 

                     Explain the pros and cons of each scenario and conduct a robust public engagement campaign with local cities, COGs, and the community.

 

Eleven alternative service plans were evaluated (Attachment B) and reviewed through the public engagement process.  Based on stakeholder and public input, the two alternatives that surfaced with most support are:

 

                     Alt C-1: trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Redondo Beach (Green Line) and Century/Aviation Station.

 

                     Alt C-3: trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Willowbrook/Rosa Parks Station and Redondo Beach.

 

The staff recommendation is Alt C-1 for the following reasons:

 

                     Connections to LAX from all directions - LAX is the fifth busiest airport in the world and third busiest in the US.  In addition, LAX and the surrounding area generates 620,610 local jobs according to LAEDC (April 2016).  Alt C-1 provides a direct connection from all three segments to and from the LAX area, while Alt C-3 eliminates direct service from South Bay.

 

                     Special event service to the new Inglewood NFL Stadium - The new Inglewood Stadium will be a significant regional and national sports venue when completed in 2020.  With 22+ NFL games per year, and major sporting events including the Super Bowl (2022), College Football National Championship (2023), FIFA World Cup (2026), and the Olympics and Paralympics Games (2028), it is imperative that convenient and direct connections are provided from all three directions of the Crenshaw/Green Line and the Downtown Inglewood Station on game days.  Alt C-1 provides the opportunity to extend South Bay trains from the LAX station to Downtown Inglewood Station to support special events.  However, South Bay would not have direct service to the Downtown Inglewood Station in Alt C-3 as South Bay trains would be headed east along the Green Line and not north along Crenshaw.

 

                     New opportunities for South Bay residents - The cell phone location-based data confirmed that the predominant travel pattern of South Bay residents is north/south along the I-405 corridor.  Alt C-3 continues the current east/west alignment for South Bay residents, and therefore does not serve their travel pattern.  Alt C-1, however, provides a new opportunity to travel north/south from South Bay.  Coupled with frequent bus connections at LAX north along the Sepulveda and Lincoln Blvd corridors, South Bay residents will have a new and competitive transit option to their primary travel destinations.

 

                     Providing adequate capacity to meet demand - Alt C-1 matches train capacity to current and anticipated demand, and provides opportunities for capacity increases from 2 to 3 car trains along Crenshaw/LAX when ridership increases or to serve special events.  Alt C-3, however, overserves the I-105 corridor of the Green Line between Aviation/Imperial and Willowbrook/Rosa Parks Stations by increasing service along this segment from 6 minute peak and 15 minute midday frequencies to 3 minute peak and 6 minute midday.  This increased service is unwarranted and will cost $10 million additional compared to Alt C-1.  Alt C-1 requires 53 cars (peak requirement + spares) and 195,000 annual revenue vehicle hours to operate.  At a marginal cost per revenue vehicle hour of $395, the annual operating cost is $77 million.  Alt C-3 requires 60 cars (peak requirement + spares) and 221,000 annual revenue vehicle hours to operates.  At a marginal cost per revenue vehicle hour of $395, the annual operating cost is $87 million.  The $395 cost per revenue vehicle hour consists of transportation (operators, supervisors, etc.), maintenance (vehicles, systems, right of way, etc), and other operating costs (security, utilities, etc.), minus support department costs, including procurement, human resources, ITS, etc.

 

                     In addition, with 2 car trains running every 3 minutes, there will not be sufficient traction power to increase service along the Crenshaw/LAX corridor from 2 to 3 car trains when needed.  This means service will be capped at two thirds of design capacity on the Crenshaw corridor.

 

This report provides a more detailed response to the Motion and recommends Alt C-1 as the preferred Crenshaw/LAX - Green Line service plan based on the technical evaluation and public engagement process.

 

Background

BACKGROUND

 

The Crenshaw/LAX Transit Project, currently under construction, is 85% complete.  Unlike the recent Gold Line Foothill and Expo Line Santa Monica extensions in which case the rail line was further extended from the end of the line, the Crenshaw/LAX Line will connect with the Green Line at a mid-line location between Mariposa and Aviation Stations.  Therefore, operations of both the Green and Crenshaw/LAX Lines must be planned as an integrated network vs. an extension of an existing line. 

 

Discussion

DISCUSSION

 

The opening of this new rail network will provide three potential directions for trains to operate.

 

                     Between Norwalk Station and Redondo Beach Station (existing Green Line)

                     Between Expo/Crenshaw Station and Norwalk Station

                     Between Expo/Crenshaw Station and Redondo Beach Station

 

When accounting for both directions, the above three service patterns result in six potential train movements through the wye junction connecting the two lines. 

 

There are several constraints at the junction that control the frequency and direction of train travel. 

 

                     Conflicting Moves - The wye junction where the Crenshaw/LAX Line meets the Green Line is a flat junction that only allows for certain train movements within each cycle.  Like a street traffic intersection, a left-hand turn cannot be permitted while oncoming through traffic is moving.  Three of the six train movements cannot be made concurrently due to this conflict: 1) Redondo Beach to Expo/Crenshaw, 2) Expo/Crenshaw to Norwalk, and 3) Norwalk to Redondo Beach.  Therefore, any service plan requiring all three of these moves will result in at least three different phases of movements within each headway cycle (e.g. three phases within six minutes for a six-minute headway.)

 

                     Traction Power - Traction power between the future 96th St/LAX Station and Expo/Crenshaw can support headways of up to 5 minutes per direction.  Therefore, operating from both ends of the Green Line to the Expo/Crenshaw Station would result in trains every 10 minutes per branch, at best.  Current Green Line service operates every 6 minutes during rush hour to accommodate the peak commute crowds. 

 

Given these operating constraints, Metro evaluated 11 alternative service plans, as presented in Attachment B, based on the following criteria:

 

                     Connection to LAX

                     Current travel patterns

                     Overall travel time for each of the six terminal-to-terminal moves

                     Ridership demand for each of the three segments

                     Consistent headways

                     Network simplicity

                     Annual Operating Cost

 

Motion 40.1 Response

 

Include Torrance Extension in Ridership Estimation

 

The Green Line currently carries about 33,000 average weekday boardings, with roughly 25,500 boardings on the segment along I-105 between Norwalk and Aviation, and about 7,500 on the Redondo Beach - Aviation segment.  The Crenshaw/LAX and Airport Metro Connector is expected to carry an additional 16,400 new boardings along the extension. 

 

Future ridership will include the Green Line Extension to Torrance anticipated in 2028.  This segment plus the current Redondo Beach demand is expected to generate about 16,300 boardings, matching the ridership projections of the Crenshaw/LAX segment. Therefore, the service plan should be revisited at least one year prior to the Torrance Extension opening to determine if travel patterns and other relevant factors show a need to change the service plan. 

 

Adjusting the operating plan of a rail line when demand changes is consistent with past practice.  For example, the operating plan for the Gold Line Foothill Extension to Azusa was changed from every other train serving the extension on a 12 minute frequency from Sierra Madre Villa Station to every train serving Azusa on a 7 minute frequency.  This change was made to accommodate the specific ridership patterns between Azusa and Old Town Pasadena, as well as increased demand along the extension.

 

Add a third scenario giving both ends of the Green Line a one-seat ride to the Expo Line

 

Staff developed two alternatives that address the Motion’s directive.  Alt D1: Operate trains from Norwalk and Redondo Beach to LAX every 6 minutes with every other train from each line extended to Expo/Crenshaw, and Alt D-2: Operate trains between Norwalk-Expo/Crenshaw and Redondo Beach - Expo/Crenshaw every 10 minutes.  Please refer to Attachment B, for an illustration of the two additional alternatives.

 

Alt D1 is not recommended as the headways (spacing between trains) are uneven along the Green Line segments due to the conflicts at the junction as well as different running times along each of the three segments.  The resulting headways would be a train every 9 minutes, then 3 minutes, then 9 minutes, etc. on the Redondo Beach and Norwalk/I-105 segments.  This uneven headway will result in overcrowding followed by an underutilized train as well as inconsistent headways for transfers to and from the Blue Line.

 

Alt D-2 is also not recommended.  Since the closest headway along Crenshaw is a train every 5 minutes, there can only be a train every 10 minutes each from Norwalk and Redondo Beach.  Current peak demand on the Green Line requires a train every 6 minutes, so 10 minute service will result in severe overcrowding and pass ups.

 

During the public outreach efforts, South Bay Cities Council of Governments (SBCCOG), requested that a rail engineering consultant be retained to further evaluate the impacts of various train movements through the junction.  Therefore, a task order was issued to Program Management’s engineering bench to develop a ail simulation model to test the operational resilience and service regularity of each given the junction, traction power, and street running traffic signal phasing constraints along Crenshaw Blvd.  Five operating scenarios that represent all possible movements through the junction were chosen to be tested, including:

 

                     Alt C-1

This recommended alternative proposes trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Redondo Beach (Green Line) and Century/Aviation Station.

 

                     Alt C-2

This alternative swaps the service patterns for trains every 6 minutes (peak) between Redondo Beach (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Norwalk (Green Line) and Century/Aviation Station.

 

                     Alt C-3

This alternative proposes trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Willowbrook/Rosa Parks Station and Redondo Beach.

 

                     Alt C-4

This alternative proposes trains every 6 minutes (peak) between Norwalk and Redondo Beach Station (existing Green Line), and trains every 6 minutes (peak) between Willowbrook/Rosa Parks (Green Line) and Expo/Crenshaw Station.

 

                     Alt D-2

This alternative proposes trains every 6 minutes (peak) between Norwalk Station (Green Line) and Century/Aviation Station, then every 12 minutes (peak) to Expo/Crenshaw, and trains every 6 minutes (peak) between Redondo Beach (Green Line) and Century/Aviation Station, then every 12 minutes (peak) to Expo/Crenshaw. This means every other train from Norwalk or Redondo Beach would terminate at Century/Aviation Station.

 

These simulations provide an animated visualization of train movements along the entire network for a one hour peak period.  Within the visualizations, one can see potential conflicts at the junction for Alt B-1, B-2, and D-1 which, combined with different running times on each segment, results in uneven spacing between trains of 3 and 9 minutes along each of the Green Line segments.  These simulation results were used to illustrate the complexity of the Crenshaw/LAX-Green Line operations during stakeholder and public engagement.

                     

Public Engagement

Metro reviewed the various alternatives, including pros and cons of each, at several stakeholder outreach meetings and events, and working closely with the COGs, Regional Service Councils, and the local community.  Meetings were conducted as follows:

Councils of Government

                     Thursday, July 26 - South Bay COG Transportation Committee

                     Monday, August 13 - South Bay COG Transportation Committee

                     Wednesday, September 5 - Gateway Cities COG Transportation Committee and Board Meeting

                     Thursday, September 20 - Westside COG Board Meeting

                     Thursday, September 27 - South Bay COG Board Meeting

                     Monday, October 8 - South Bay COG Transportation Committee

 

Regional Service Councils

                     Wednesday, September 12 - Westside/Central Service Council

                     Thursday, September 13 - Gateway Cities Service Council

                     Friday, September 14 - South Bay Service Council

 

Community

                     Tuesday, September 25 - Crenshaw Community Leadership Council (CLC) (Inglewood Public Library)

                     Monday, September 17 - Public Meeting (Gateway Council of Governments)

                     Thursday, September 20 - Public Meeting (The Proud Bird - 11022 Aviation Blvd)

                     Wednesday, September 26 - Public Meeting (Baldwin Hills Crenshaw Mall)

 

In addition to these meetings staff met and briefed the offices of Los Angeles Councilmembers Wesson and Harris-Dawson, Westchester Neighborhood Council, LAX Coastal Chamber, Gateway LA Business Improvement District, and the North Redondo Beach Merchants Association.

 

Comments and recommendations varied widely depending on the groups represented.  In general, constituents along the Crenshaw corridor favor staff’s recommendation of Alt C-1 given the travel patterns of the vast majority of Green Line riders as well as potential new riders identified through cell phone based travel demand data.  Gateway Cities stakeholders also agree with alternatives that connect the Norwalk/I-105 segment of the Green Line with the Crenshaw corridor, including Alt C-3 and staff’s recommended Alt C-1.  South Bay stakeholders prefer any alternative that preserves service for current Green Line riders and provides a fast service between the South Bay and Downtown LA via direct connections to the Silver and Blue Lines.  This service would essentially help to augment LADOT’s Commuter Express Line 438 between South Bay and Downtown LA, which only operates during the peak hours in the peak direction.  Below is specific feedback received by each of the groups.

 

South Bay Cities COG (SBCCOG)

 

                     Overall, the SBCCOG agree that the Metro Board should approve a preferred alternative that maintains enough capacity to accommodate existing Green Line demand.  They also believe that the Board should select an operating plan that meets the demand and travel patterns existing today, but that the plan should be revisited if demand changes such as with the Green Line Torrance Extension. 

 

                     Specific to South Bay, they are concerned that without a major line operating out of Redondo Beach, ridership will not increase along their segment.  There was also significant discussion about the need for fast service all day between the South Bay and downtown LA, and several members mentioned LADOT’s Commuter Express Line 438 as being the ideal service for them.  The only drawback to Line 438 currently is the limited span of service (peak hour only). 

 

                     The SBCCOG prefers the following alternatives, in priority order:

 

1.                     C-5 (Redondo Beach - Norwalk, and Redondo Beach - Expo/Crenshaw)

 

2.                     C-4 (Redondo Beach - Norwalk, and Willowbrook/Rosa Parks - Expo/Crenshaw)

 

3.                     C-3 (Redondo Beach - Willowbrook/Rosa Parks, and Norwalk - Expo/Crenshaw)

 

In addition, SBCCOG wanted to continue to explore opportunities to address the junction conflicts and uneven headways of B-2.

 

Gateway Cities COG (GCCOG)

 

                     GCCOG selected the following as their preferred alternatives, in priority order:

 

1.                     C-3 (Redondo Beach - Willowbrook/Rosa Parks, and Norwalk - Expo/Crenshaw).  Note that this option is only preferred if Metro will commit to maintaining 6 minute frequencies on both lines.  This would result in over-service of the segment between Aviation Station and Willowbrook/Rosa Parks Station with trains every 3 min during the peak period compared to the current 6 minute frequency.  If service along this segment is reduced to the current 6 minute frequency, GCCOG prefers Alt C-1.

 

2.                     C-1 (Norwalk - Expo/Crenshaw, Redondo Beach - LAX)

 

Regional Service Councils

 

                     While this item was a receive and file at the service council meetings, Gateway Cities Service Council members prefer the staff recommendation of Alt. C-1.

 

                     South Bay Service Council discussed this item and took public comment.  There was no consensus on a preferred alignment.

 

                     Westside Central Service Council had little comment on the operating plan.

 

Public Meetings

 

                     The Crenshaw Community Leadership Council agreed that the staff recommended Alt C-1 is the preferred operating plan given current ridership patterns from the Green Line Norwalk/I-105 segment and the fact that most people travelling from the South Bay are destined along the I-405 corridor which is west of the Crenshaw Line.

 

                     Comments at the Baldwin Hills Crenshaw Mall focused on bus service within the Crenshaw area rather than the rail operating plan.

 

                     While GCCOG members reiterated their adopted recommendations at the public meeting held in Paramount, the general sentiment of the public participants was in favor of C-1.

 

                     Comments at the Proud Bird public meeting favored alternatives that provided service between Redondo Beach and Expo/Crenshaw or direct connections between Redondo Beach and the Silver or Blue Lines for fast service into Downtown LA.

 

                     Oral comments were provided by the public and recorded on tape. Six written comments were submitted for the public record. 

 

Recommendation

 

Attachment C provides a comparison of the 6 alternatives that were selected by stakeholders for final consideration.  Based on stakeholder and public input, the two alternatives that surfaced with most support are:

 

                     Alt C-1: trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Redondo Beach (Green Line) and Century/Aviation Station.

 

                     Alt C-3: trains every 6 minutes (peak) between Norwalk Station (Green Line) and Expo/Crenshaw, and trains every 6 minutes (peak) between Willowbrook/Rosa Parks Station and Redondo Beach.

 

Both of these alternatives match the current travel patterns of the majority of Green Line riders as well as expected future ridership based on the cell phone travel demand data. As seen from the cell phone based travel demand data shown in Attachment B, people travelling from the I-105 corridor are destined to many places that the Crenshaw Line will service.  In contrast, people travelling from the El Segundo area are destined to places north and south along the I-405 corridor.  Therefore, potential new ridership along the Crenshaw corridor would be expected from the I-105 corridor and not from El Segundo. However, 3,400 current Green Line riders who are destined to the Redondo Beach segment will incur a 7 minute transfer penalty under Alt C-1.  This transfer is similar to the Blue - Expo Line transfer at Pico Station which requires 9 minutes (3 min from junction to Pico Station, 3 min transfer, 3 min from Pico Station to junction). 

 

The tradeoff for the transfer penalty is that Alt C-1 provides direct connections to LAX and the future 96th Street Station from all three terminals, while Alt C-3 does not serve LAX/96th Street north of the new AMC/LAX Station directly from the Redondo Beach segment, reducing access to LAX and employment around the airport from the South Bay.  In addition, it would limit the ability to provide weekend special event service directly from the South Bay to the new NFL stadium via the Downtown Inglewood Station since there would not be a train route from the Redondo Beach segment that could be extended north from LAX to Downtown Inglewood on game days.   (Of note, due to the junction and traction power constraints identified above, it is not feasible to run every day service between the South Bay and Downtown Inglewood Station under Alt C-1).

 

The cell phone location-based data also confirms that the predominant travel pattern of South Bay residents is north/south along the I-405 corridor.  Alt C-3 continues the current east/west alignment for South Bay residents, and therefore does not serve their travel pattern.  Alt C-1, however, provides a new opportunity to travel north/south from South Bay.  Coupled with frequent bus connections at LAX north along the Sepulveda and Lincoln Blvd corridors, South Bay residents will have a competitive transit option to their primary travel destinations.

 

Finally, C-3 overserves the 8 mile segment of the Green Line between Aviation Station and Willowbrook/Rosa Parks Station.  Currently this segment of the Green Line operates every 6 minutes during peak hours and 15 minutes during midday using 2-car trains.  This amount of capacity is sufficient to accommodate demand.  C-3 would increase service along this segment to every 3 minutes during the peak and 6 minutes during midday.  As a result, this corridor would be greatly overserved at an additional cost of $10 million per year compared to Alt C-1.  Alt C-1 requires 53 cars (peak requirement + spares) and 195,000 annual revenue vehicle hours to operate.  At a marginal cost per revenue vehicle hour of $395, the annual operating cost is $77 million.  Alt C-3 requires 60 cars (peak requirement + spares) and 221,000 annual revenue vehicle hours to operates.  At a marginal cost per revenue vehicle hour of $395, the annual operating cost is $87 million.  The $395 cost per revenue vehicle hour consists of transportation (operators, supervisors, etc.), maintenance (vehicles, systems, right of way, etc), and other operating costs (security, utilities, etc.), minus support department costs, including procurement, human resources, ITS, etc.

 

In addition, with 2 car trains running every 3 minutes, there will not be sufficient traction power to increase service along the Crenshaw/LAX corridor from 2 to 3 car trains when needed.  This means service will be capped at two thirds of design capacity on the Crenshaw corridor.

Given the evaluation criteria, rail operations simulation, and public engagement results, staff recommends Alt C-1 as the preferred operations plan for initial revenue service of the Crenshaw/LAX - Green Line network. 

      

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

The recommended action of Alt C-1 will improve the implementation of the Crenshaw/LAX Line by simplifying the operating plan and enhance Metro’s ability to provide service that is safe and reliable.

 

Financial_Impact

FINANCIAL IMPACT

 

The operating cost for the Crenshaw/LAX and Green Line rail service will be approved through the FY20 budget process.

 

Implementation_of_Strategic_Plan_Goals

IMPLEMENTATION OF STRATEGIC PLAN GOALS

 

Approval of this recommendation supports several following Metro Strategic Plan Goals: 

1.                     Provide high-quality mobility options that enable people to spend less time travelling

2.                     Deliver outstanding trip experience for all users of the transportation system

3.                     Enhance communities and lives through mobility and access to opportunity

 

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

The remaining scenarios could be considered for the Crenshaw/LAX operating plan.  However, staff does not recommend this approach.  Staff asserts that there are distinct advantages to Alt C-1.  Pursuing other alternatives could lead to significant overcrowding for today’s customers, underutilized trains in other areas, poor transfer connectivity to the overall Metro system, and potentially negative impacts to the Blue and Expo Lines. 

Next_Steps

NEXT STEPS

 

Staff will continue public outreach on the Crenshaw/LAX Line and update information, including station signage and maps, to match the recommended operating plan. 

 

Attachments

ATTACHMENTS

 

Attachment A - Motion 40.1 - Crenshaw/Green Line Operating Plan

Attachment B - Crenshaw/LAX - Green Line Alternative Service Plan Evaluation

Attachment C - Comparison of Final 6 Operating Alternatives

 

Prepared_by

Prepared by:                      Stephen Tu, Senior Manager, Operations, (213) 418-3005

                     Conan Cheung, Senior Executive Officer, (213) 418-3034

 

Reviewed_By

Reviewed by:                      James T. Gallagher, Chief Operations Officer, (213) 418-3108