Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.
Meeting Name: Budget Public Hearing Agenda status: Final
Meeting date/time: 5/17/2017 1:00 PM Minutes status: Draft  
Meeting location: One Gateway Plaza, Los Angeles, CA 90012, 3rd Floor, Metro Board Room
Published agenda: Agenda Agenda Published minutes: Not available  
Meeting video: eComment: Not available  
Attachments:
File #Agenda #TypeTitleActionResultAction DetailsAudio
2017-0279  Public HearingCONSIDER: A. ADOPTING the proposed FY18 Budget as presented in the budget document (provided in a separate transmittal and posted on metro.net); and B. APPROVING the addition of 129 positions, including 22 contract and 107 non-contract full-time equivalent positions, as presented in Attachment A; and C. APPROVING the Life of Project (LOP) budgets for new capital projects with LOP exceeding $5 million, included in the proposed FY18 Budget and presented in Attachment B; and D. ADOPTING Life of Project (LOP) budget of $118.9 million for Blue Line Signaling Rehabilitation and Operational State of Good Repair Improvements that incorporates system compatibility, safety features, and new technology to improve headways during service interruptions, further described in Attachment B; and E. AMENDING the proposed budget to add $8.2 million for engineering support and advanced utility relocation designs on Metro Orange Line Grade Separation (project submitted after proposed budget was published); and F. AMENDING the proposed budget to add $1 million for the Comprehensive Opera   Not available Audio Audio