Meeting_Body
REVISED
PLANNING AND PROGRAMMING COMMITTEE
NOVEMBER 18, 2026
Preamble
Motion by:
DIRECTORS PADILLA, BASS, AYALA, HORVATH AND BARGER
Improving Connectivity and Reliability for the East Valley Metrolink System Motion
The East San Fernando Valley is one of the fastest growing, most transit dependent parts of Los Angeles, yet its link to regional rail remains incomplete. Sylmar, the future infill station at Pacoima, and Sun Valley, a six-mile corridor, anchor Metrolink's Antelope Valley Line through the San Fernando Valley, connecting these neighborhoods to the Antelope Valley, Downtown LA, and the broader Southern California rail network. Yet none of the three function today as real multimodal hubs. Sun Valley sits in an industrial area with some of the line's lowest boardings. Sylmar was once planned as the northern terminus of the East San Fernando Valley (ESFV) Light Rail Transit Project; the Board has since adopted a new Metrolink infill station at Pacoima instead, approving $6.9 million to begin its design. The Brighton to Roxford Double Track Project will add a second mainline track through Sun Valley and Pacoima, expanding capacity along the corridor.
How well the Antelope Valley Line connects to housing, jobs, and daily life in the East Valley will shape ridership and equity outcomes for decades, which is why the details still being worked out matter. The Pacoima station's platform configuration remains undecided, and Brighton to Roxford's right-of-way overlaps, on a much longer horizon, with the California High-Speed Rail Authority's still uncertain Palmdale to Burbank alignment through Sun Valley. This work supports Metro's Vision 2028 goals for community access, regional collaboration, and equity focused communities, and reflects the Board's Measure M commitment to East San Fernando Valley rail investment. Reliable, well-connected service across all three stations is central to the corridor's long-term value.
Subject
SUBJECT: IMPROVING CONNECTIVITY AND RELIABILITY FOR THE EAST
VALLEY METROLINK SYSTEM MOTION
Heading
RECOMMENDATION
Title
APPROVE Motion by Padilla, Bass, Ayala, Horvath, and Barger that the Board direct the Chief Executive Officer to:
A. Prepare a First/Last Mile plan for the Sun Valley Metrolink Station with a Transit Oriented Development (TOD) Vision study focused on the redevelopment potential of underutilized industrial parcels in Sun Valley and along the San Fernando Road industrial corridor, coordinated with the Brighton to Roxford Double Track Project;
B. Evaluate whether improvements identified for the former Sylmar Light Rail Transit station in the 2020 ESFV Light Rail Transit Project's First/Last Mile plan are applicable to the Sylmar Metrolink Station; based on the results of the Shared Right-of Way Study; and
C. Establish early coordination on the design and construction schedule of the Brighton to Roxford Double Track Project with the California High-Speed Rail Authority's Palmdale to Burbank selected alignment through Sun Valley. Develop recommendations that preserve design flexibility and experience for riders.