File #: 2026-0137   
Type: Contract Status: Agenda Ready
File created: 2/13/2026 In control: Construction Committee
On agenda: 4/15/2026 Final action:
Title: AUTHORIZE the Chief Executive Officer or their designee to: A. EXECUTE Modification No. 01 to Contract No. PS1334-5600 with Dr. Youssef Hashash to continue to provide Tunnel Advisory Panel Services, in an amount Not-To-Exceed (NTE) $781,459 increasing the total contract value from $329,562 to $1,111,021 and extend the contract from June 30, 2026, to June 30, 2029; B. EXECUTE Modification No. 09 to Contract No. PS-8510-2493 with Dr. Edward J. Cording, to continue to provide Tunnel Advisory Panel Services, in an amount NTE $781,610, increasing the total contract value from $3,671,235 to $4,452,845 and extend the contract from June 30, 2026 to June 30, 2029; and C. EXECUTE Modification No. 03 to Contract No. PS1620-80000, with Dr. Thomas O'Rourke, to continue to provide Tunnel Advisory Panel Services, in an amount NTE $642,469, increasing the total contract value from $1,586,457 to $2,228,926 and extend the contract from June 30, 2026, to June 30, 2029.
Sponsors: Board of Directors - Regular Board Meeting
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - Contract Modification Change Log, 3. Attachment C - DEOD Summary (CONTRACT NO. PS1334-5600), 4. Attachment D - DEOD Summary (CONTRACT NO. PS-8510-2493), 5. Attachment E - DEOD Summary (CONTRACT NO. PS1620-8000), 6. Presentation
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.

Meeting_Body

CONSTRUCTION COMMITTEE

APRIL 15, 2026

 

Subject    

SUBJECT:                     TUNNEL ADVISORY PANEL SERVICES

 

Action

ACTION:                     APPROVE RECOMMENDATION

 

Heading

RECOMMENDATION

 

Title

AUTHORIZE the Chief Executive Officer or their designee to:

 

A.                     EXECUTE Modification No. 01 to Contract No. PS1334-5600 with Dr. Youssef Hashash to continue to provide Tunnel Advisory Panel Services, in an amount Not-To-Exceed (NTE) $781,459 increasing the total contract value from $329,562 to $1,111,021 and extend the contract from June 30, 2026, to June 30, 2029;

 

B.                     EXECUTE Modification No. 09 to Contract No. PS-8510-2493 with Dr. Edward J. Cording, to continue to provide Tunnel Advisory Panel Services, in an amount NTE $781,610, increasing the total contract value from $3,671,235 to $4,452,845 and extend the contract from June 30, 2026 to June 30, 2029; and

 

C.                     EXECUTE Modification No. 03 to Contract No. PS1620-80000, with Dr. Thomas O’Rourke, to continue to provide Tunnel Advisory Panel Services, in an amount NTE $642,469, increasing the total contract value from $1,586,457 to $2,228,926 and extend the contract from June 30, 2026, to June 30, 2029.

 

Issue

ISSUE

 

Metro is currently planning, designing, and constructing rail transit projects with extensive underground engineering and construction that involve complex geotechnical and tunneling conditions. Current projects with tunnel segments include the Westside Purple Line Extension Section 2 and Section 3 Projects, Southeast Gateway Line Project, Sepulveda Transit Project, Eastside Transit Corridor Phase 2 Project,  and K Line Northern Extension.  Los Angeles County has challenging geologic, seismic and tunneling conditions and deep underground station construction, with some through fault rupture zones, tar impregnated soil, toxic gases, high concentration of methane, squeezing ground and high groundwater pressures. While Metro has extensive experience from both staff and engineering consultants, there is the need for an independent Tunnel Advisory Panel (TAP) to provide expert advice and review of this engineering work. The Tunnel Advisory Panel, comprised of Dr. Youssef Hashash, Dr. Edward Cording, and Dr. Thomas O’Rourke, are recognized in the industry and worldwide as engineering/construction experts in geotechnical analyses, tunneling, deep excavation, earthquake engineering, and building settlements.

 

Background

BACKGROUND

 

The TAP was originally convened in August 1995 in response to questions posed by the Board regarding the feasibility of tunneling in Los Angeles ground conditions. Metro contracted with Drs. Dan Eisenstein, Geoffrey Martin and Harvey Parker to determine the feasibility of tunneling in Los Angeles, to assess the effectiveness of Metro's construction program to date, and to recommend any modifications to the current construction program deemed appropriate.

 

In June 2001, the Board approved two, five-year contracts to the members of the TAP in the amount not-to-exceed $1,167,826 and directed staff to return each year for funding approval. Since then, the Board has approved funding and extensions to the TAP contracts. Due to Dr. Eisenstein's untimely death in April 2009, Metro procured an additional member for the TAP, Dr. Edward Cording, to provide expert technical services. With Dr. Harvey Parker passing away in May 2020, Metro staff procured an additional member for the TAP, Dr. Thomas O’Rourke, to provide expert technical services.  With Dr. Geoffrey Martin retiring in April 2025, Metro procured an additional member for the TAP, Dr. Youssef Hashash in July 2025 to provide expert technical services.

 

The current TAP members are respected academics, with extensive industry engagement and were elected members of the National Academy of Engineering. Dr. Youssef Hashash is a Distinguished Professor of Civil Engineering at the University of Illinois Urbana-Champaign. Dr Edward Cording is a former Professor of Civil Engineering from the University of Illinois Urbana-Champaign with Emeritus status. Dr Tom O’Rourke is a Professor of Engineering Emeritus at Cornell University and President of the Earthquake Engineering Research Institute. All have led authoritative industry leading research and written definitive technical publications as well as engaged with other government agencies providing technical support in the areas of tunneling, deep excavations and design for seismic resiliency.

 

Discussion

DISCUSSION

 

The TAP members, Drs. Hashash, Cording, and O’Rourke, have been providing advice on all Metro projects with underground construction elements. The projects that TAP has been involved with include extensive underground engineering and construction that involve complex geotechnical and tunneling issues in both soils and rock for which the TAP members are uniquely qualified.

 

The status of each project and the TAP members’ involvement in them is as follows:

 

Westside Purple Line (D Line) Extension Project

The Westside Purple Line (D Line) Extension Project was adopted by the Board and the Final Environmental Impact Report (EIR) was certified in 2012. The project is being designed and constructed in three sections. The entire 9-mile project consists of twin-bored tunnels with 7 subway stations which are primarily under Wilshire Boulevard. Section 1 - Wilshire/Western to Wilshire/La Cienega is expected to open for revenue service on May 8, 2026.

 

Metro has retained the services of the TAP to provide independent review and monitoring of the following work that is being performed by Metro’s engineering consultants and contractors:

                     Section 2 - Wilshire/La Cienega to Century City Constellation Station (2.59 miles of twin-bored tunnels, 2 subway stations) - Since the tunneling and underground construction activities for this section of the project is complete, the TAP has concluded providing expert advice on a regular basis for this section of the project.  The project will, however, seek expert advice on an as-needed basis with issues that may arise including claim resolution.  

                     Section 3 - Century City/Constellation Station to Westwood/VA Hospital Station (2.56 miles of twin-bored tunnels, 2 subway stations) - The Notice-To-Proceed (NTP) for the Design/Build Contract (Tunnels, Stations, Systems and Trackwork) Tunnel was issued on January 2019 and the NTP for Station was issued in May 2019. Final design is nearly complete and tunnel construction is complete. The TAP will be required to provide expert advice on the station design and construction including the geotechnical conditions encountered, the monitoring of potential ground movements associated with station construction adjacent to mission critical federal facilities and privately owned tall office buildings.

 

Southeast Gateway Line Project

The Southeast Gateway Line Project is a new light rail transit (LRT) line to southeast LA County, connecting Artesia, Cerritos, Bellflower, Paramount, Downey, South Gate, Cudahy, Bell, Huntington Park, Vernon and unincorporated Florence-Firestone.  The project was environmentally cleared in August 2024.

 

TAP will be providing expert advice for the proposed crossing beneath the 710 freeway on the following topics: 

                     Techniques for excavating for and jacking a large tunnel/box structure beneath the freeway

                     Ground movements and changes to the groundwater table associated with proposed methods

                     TAP will also provide expert advice for the proposed northern extension of the project as required when planning and early engineering proceed

 

Sepulveda Transit Corridor Project

The Sepulveda Transit Corridor Project is currently in the planning and environmental clearance phase. The Board approved Modified Alternative 5, an underground heavy rail alternative, as the Locally Preferred Alternative for the project on January 22, 2026. Metro is working with a private sector contractor, Sepulveda Transit Corridor Partners, under a pre-development agreement to advance delivery of this project. The TAP will be providing expert advice for the following topics:

                     Tunneling through the Santa Monica Mountain involves rock masses ranging from weak to strong with low to high abrasivity

                     Tunneling through alluvial soils

                     Tunneling through fault zones

                     Tunneling with relatively high groundwater pressures

                     Mixed face tunneling large diameter and long bored tunnels

 

Eastside Transit Corridor Project - Phase 2

The Eastside Transit Corridor Phase 2 Project will extend the existing Metro L (Gold) Line from the existing terminus station at Atlantic Boulevard and Pomona Boulevard in East Los Angeles to Lambert Road in Whittier in eastern Los Angeles County. The Board adopted the Locally Preferred Alternative (LPA) as Pomona/Atlantic Station to Greenwood at the December 2022 Board meeting. About 3 miles of this alternative is an underground configuration along Atlantic Boulevard in unincorporated East Los Angeles. TAP will be providing expert advice for the following topics:

                     Tunnel alignment design

                     Ground movements and changes of the groundwater table associated with proposed methods of excavation and support for cut and cover structures

                     Ground movements and changes to the groundwater table associated with proposed tunneling methods

                     Crossing beneath Heavy Freight and Passenger Railroads

 

K Line Northern Extension

The K Line Northern Extension will extend the existing Metro K Line from the existing terminus station at the Crenshaw/Expo Station north to the D Line at Wilshire Blvd and the B Line at the Hollywood/Highland station with a potential terminus at the Hollywood Bowl. The new rail service will connect Metro’s C, E, D and B Lines, serving six of LA’s busiest bus corridors and improving access to jobs, healthcare and entertainment.  TAP will be providing expert advice for the following topics as the environmental review and early engineering proceeds:

                     Tunnel alignment design

                     Ground movements and changes of the groundwater table associated with proposed methods of excavation and support for cut and cover structures

                     Ground movements and changes to the groundwater table associated with proposed tunneling methods

                     Impact of tunneling on residential and commercial buildings

                     Asphalt infused soils and gassy ground conditions

                     Potential active fault crossings

                     Hard rock conditions

 

In addition to the above Projects, TAP may be asked to provide ad-hoc services to other projects and for the existing underground infrastructure as needed by Metro Staff.

 

TAP members are involved with on-going support relating to third party and project stakeholders’ issues, which will require continuation of their services for the future. They have unique knowledge and background on Los Angeles County's underground conditions and intimate knowledge of Metro's past and current engineering and construction projects.

 

Board approval of the recommendations will allow the continuation of services of the three TAP members to support Metro on the aforementioned projects and will also allow the TAP to provide ad-hoc services to other projects as needed by Metro staff.

 

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

From a safety perspective, underground construction is inherently one of the most high-risk activities on transit projects. TAP provides independent reviews and imparts technical know-how and expertise for the safe construction of underground facilities. All services supported by this contract are centered on promoting public and worker safety, avoiding project delays, and promoting cost saving measures to effectively deliver the projects with minimal impacts to the adjacent communities.

 

Financial_Impact

FINANCIAL IMPACT

 

The funding for these services is included in the Proposed FY27 budget in various Capital Projects. Task Orders will be issued and funded from the associated project’s fiscal year and Life-of-Project (LOP) budgets. The funding source differs depending on the individual project. These activities will remain within the approved LOP for each project.

 

Since this is a multi-year contract, the cost center managers, respective project managers and Chief Program Management Officer will be responsible for budgeting the cost of the annual work program for each fiscal year for the term of the contract.

 

Impact to Budget

 

The funding for these Contract Modifications is provided by the specific project requiring the services. The source for these funds is in line with the respective projects’ funding plans and fund sources may consist of federal and/or state grants as well as local funds. These funds are not operating eligible funds.

 

Equity_Platform

EQUITY PLATFORM

 

The Tunnel Advisory Panel services provide technical advice and expertise for various Metro projects with underground design and construction components throughout the County of Los Angeles, including several which serve Equity Focus Communities. These services are essential for the support and safe delivery of Metro projects which run across the greater Los Angeles area. All services supported by this contract are centered on delivering the projects with minimal impacts on the communities and provide benefits of enhanced mobility and regional access to all populations within the respective project areas. At the time of solicitation, the Diversity and Economic Opportunity Department  did not establish a Disadvantaged Business Enterprise  goal for procurement due to the lack of subcontracting opportunities, as the services provided are for specific named individuals, with no other services.

 

Vehicle_Miles_Traveled_Outcome

VEHICLE MILES TRAVELED OUTCOME

 

Vehicle Miles Traveled (VMT) and VMT per capita in Los Angeles County are lower than national averages, the lowest in the SCAG region, and on the lower end of VMT per capita statewide, with these declining VMT trends due in part to Metro’s significant investment in rail and bus transit.*  Metro’s Board-adopted VMT reduction targets align with California’s statewide climate goals, including achieving carbon neutrality by 2045. To ensure continued progress, all Board items are assessed for their potential impact on VMT.

 

As part of these ongoing efforts, this item is expected to contribute to further reductions in VMT. While this item does not directly encourage taking transit, sharing a ride, or using active transportation, it is a vital part of Metro operations, as it provides expert review and oversight of tunneling and underground construction in Metro’s operations. Because the Metro Board has adopted an agency-wide VMT Reduction Target, and this item supports the overall function of the agency, this item is consistent with the goals of reducing VMT.

 

*Based on population estimates from the United States Census and VMT estimates from Caltrans’ Highway Performance Monitoring System (HPMS) data between 2001-2019.

 

Implementation_of_Strategic_Plan_Goals

IMPLEMENTATION OF STRATEGIC PLAN GOALS

 

This recommendation supports the Strategic Plan Goal # 5, “Provide responsive, accountable, and trustworthy governance within the Metro organization” by providing review and oversight of tunneling and underground construction.

 

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

Staff has considered the alternative of allowing the current contracts with Dr. Hashash, Dr. Cording, and Dr. O’Rourke to expire and open a procurement notice to solicit applications from potential new members, but recommend to execute the contract modifications for the current TAP panel members for the following reasons:

 

                     Current TAP members Drs. Hashash, Cording and O’Rourke have a long history and institutional knowledge of Metro together with their knowledge of local soil and rock conditions and technical understanding of specific tunnel related issues in general and those pertaining to local conditions in particular would require significant investment in time and resources to replicate even if other equally suitable candidates were found and used in this role. This would not only incur cost but would significantly reduce the benefit and validity of their advice, while this knowledge and understanding were obtained. This is not recommended as it will leave Metro without the benefit of their extensive local experience, knowledge and expertise and create a void in the required tunneling expertise for a considerable period, thereby creating the potential for delays and additional costs to ongoing Metro projects.

 

                     Metro baseline documents include Design Criteria, Standard Drawings, Directive Drawings and Baseline Specifications. These baseline documents were adapted and updated from documents previously utilized for prior projects and are being continuously updated to incorporate the Lessons Learned from the past and current projects or to account for evolving technologies. Current TAP members have observed developments and successes on Metro’s current projects that need to be documented and be made available to both current and future Metro projects. Executing the contract modification with the current TAP members would enable Metro to continue seeking this valuable input from them to update the baseline documents with the lessons learned from their engagements from all the current large projects. This will make the Metro Baseline a set of industry leading document and capture the issues from Metro’s past and current Projects.

 

                      Extension and additional funding for the TAP contracts are vital and essential to provide continuity that would otherwise be interrupted, should the Board decide to cancel and re-procure the TAP contracts (a six to nine-month process). Furthermore, the history and knowledge of the current designs, geotechnical conditions, and construction approaches will present a steep learning curve for a new team of TAP members, which could significantly delay the timely review and input necessary to provide this important layer of independent monitoring and oversight across these complex engineering and construction projects.

 

Next_Steps

NEXT STEPS

 

Upon Board approval, staff will execute the Contract Modifications, and will direct the Tunnel Advisory Panel to continue providing tunnel engineering advice to Metro including supporting the aforementioned projects.

 

Attachments

ATTACHMENTS

 

Attachment A - Procurement Summary

Attachment B - Contract Modification Change Log

Attachment C - DEOD Summary (CONTRACT NO. PS1334-5600)

Attachment D - DEOD Summary (CONTRACT NO. PS-8510-2493)

Attachment E - DEOD Summary (CONTRACT NO. PS1620-8000)

 

Prepared_by

Prepared by:                      Matthew Crow, Deputy Executive Officer, Project Management (213) 842 8505

Androush Danielians, Senior Executive Officer, Project Management (213) 922-7598

Carolina Coppolo, Deputy Chief Vendor/Contract Management Officer, (213) 418-3051

Michael Ratnasingham, Deputy Chief Program Management Officer, (213) 418-3440

 

Reviewed_By

Reviewed by:                      Timothy Lindholm, Chief Program Management Officer, (213) 418-3369