File #: 2016-0644   
Type: Motion / Motion Response Status: Agenda Ready
File created: 8/17/2016 In control: System Safety, Security and Operations Committee
On agenda: 8/18/2016 Final action:
Title: AMENDMENT by Antonovich and Najarian that the CEO direct staff to: A. Place wayfinding signage at stops along Line 501, including North Hollywood station, Burbank, Glendale, Del Mar station and Memorial Park station to ensure that riders can easily locate Line 501; and B. Ensure that Line 501 is included on existing informational signage at each stop that lists connections and destinations; FURTHER MOVE THAT the CEO report back at the October 2016 Board meeting with an expanded plan to increase Line 501 ridership that includes, but is not limited to: A. A feasibility study for reducing fares to match MTA's regular fare and transfer structure and/or promotional programming that offers free or discounted fares for a specified period of time (e.g. 60 days) B. Identification of weekend sporting, concert, holiday, cultural and other major events in the City of Los Angeles and the cities along the SR-134 and I-210 corridors, coupled with a cost-effective marketing plan that promotes Lin...
Sponsors: Board of Directors - Regular Board Meeting
Indexes: Ara Najarian, Bob Hope Airport, Burbank, City of Los Angeles, Del Mar Station, Glendale, Memorial Park Station, Metro Gold Line, Metro Orange Line, Metro Rail A Line, Michael Antonovich, Motion / Motion Response, North Hollywood Station, Plan, Ridership
Related files: 2016-0529

Meeting_Body

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE

AUGUST 18, 2016

 

Preamble

Motion by:

 

Antonovich and Najarian

 

August 18, 2016

 

Relating to Item 30, File ID 2016-0529

 

Amendment to Item 30: Performance Updates on Line 501 Pilot Express Bus Service

 

MTA’s 501 Pilot Express Bus (Line 501) began service March 1, 2016, providing a quick connection between the Orange and Gold Lines. While Line 501 has yet to meet its anticipated performance measures, ridership appears to be slowly but steadily increasing. The Los Angeles Department of Transportation runs a similar line that serves an additional 300 daily peak riders. If combined, weekday ridership between the two lines has reached 1371. MTA staff is recommending that the Line 501Pilot be extended an additional 180 days and that service modifications be approved to improve scheduling efficiencies and increase service.

 

We believe, in addition to the staff recommendations above, that new wayfinding signage, an expanded marketing plan, and a reduction in fares may result in Line 501 exceeding its anticipated performance measures.

 

Title

AMENDMENT by Antonovich and Najarian that the CEO direct staff to:

 

A.                     Place wayfinding signage at stops along Line 501, including North Hollywood station, Burbank, Glendale, Del Mar station and Memorial Park station to ensure that riders can easily locate Line 501; and

 

B.                     Ensure that Line 501 is included on existing informational signage at each stop that lists connections and destinations;

 

FURTHER MOVE THAT the CEO report back at the October 2016 Board meeting with an expanded plan to increase Line 501 ridership that includes, but is not limited to:

 

A.                     A feasibility study for reducing fares to match MTA’s regular fare and transfer structure and/or promotional programming that offers free or discounted fares for a specified period of time (e.g. 60 days)

 

B.                     Identification of weekend sporting, concert, holiday, cultural and other major events in the City of Los Angeles and the cities along the SR-134 and I-210 corridors, coupled with a cost-effective marketing plan that promotes Line 501 service as a preferred mode of transportation to those events;

 

C.                     New eye-catching marketing materials such as seat drops and signage on the Orange and Gold Lines that promote destinations by way of Line 501 connections, such as Hollywood Burbank Airport; and

 

D.                     A cost estimate and the feasibility of including Line 501 on system map kiosks.

 

E.                     A cost estimate and the feasibility of increasing span of service by adding trips earlier in the morning and later into the evening, up to midnight.