File #: 2017-0844   
Type: Contract Status: Agenda Ready
File created: 12/14/2017 In control: System Safety, Security and Operations Committee
On agenda: 2/15/2018 Final action:
Title: CONSIDER: A. AUTHORIZING the Chief Executive Officer to award Contract No. OP43306000 to Ansaldo STS USA, Inc. for the upgrade of the MGL track circuits and train-to-wayside equipment, for an amount of $18,655,966.78, effective March 2018 through February 2023; and B. AWARDING a single source procurement, pursuant to California Public Utilities Code Section 130237. The MGL track circuits and TWC are proprietary and Ansaldo STS is the sole manufacturer of the components. The components are needed for integration with the existing Ansaldo Microlok II Train Control System in use on the MGL. (REQUIRES TWO-THIRDS VOTE OF THE FULL BOARD)
Sponsors: System Safety, Security and Operations Committee
Indexes: Board approved Life-of-Project Budget, Budgeting, Capital Project, Contracts, Crenshaw/LAX Transit Corridor Project, Equipment Acquisitions, Light rail transit, Los Angeles International Airport, Metro Crenshaw Line, Metro Gold Line, Metro Green Line, Metro Rail A Line, Metro Rail C Line, Metro Rail K Line, Mgl Track Circuits And Twc Replacement (Project), Procurement, Safety, Track circuits
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - DEOD Summary
Related files: 2018-0091
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.

Meeting_Body

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE

FEBRUARY 15, 2018

 

Subject

SUBJECT:                     METRO GREEN LINE (MGL) TRACK CIRCUITS AND

TRAIN-TO-WAYSIDE COMMUNICATION (TWC)

UPGRADE

 

Action

ACTION:                     AWARD CONTRACT

 

Heading

RECOMMENDATION

 

Title

CONSIDER:

 

A.                     AUTHORIZING the Chief Executive Officer to award Contract No. OP43306000 to Ansaldo STS USA, Inc. for the upgrade of the MGL track circuits and train-to-wayside equipment, for an amount of $18,655,966.78, effective March 2018 through February 2023; and

 

B.                     AWARDING a single source procurement, pursuant to California Public Utilities Code Section 130237. The MGL track circuits and TWC are proprietary and Ansaldo STS is the sole manufacturer of the components. The components are needed for integration with the existing Ansaldo Microlok II Train Control System in use on the MGL.   

 

(REQUIRES TWO-THIRDS VOTE OF THE FULL BOARD)

 

Issue

ISSUE

 

The MGL is equipped with legacy track circuits and TWC that has been operational from initial start of MGL service in 1995. The existing equipment was delivered by Ansaldo STS USA, Inc. (formally Union Switch and Signal Inc.) under Contract No. H1100. The equipment is now obsolete and no longer supported by the Original Equipment Manufacturer. The equipment needs to be replaced as it nears the end of its useful life.

 

Discussion

DISCUSSION

 

Commencing in 2012, Metro Wayside Systems has implemented a phased program of rehabilitation of the MGL train control system. The first phase of work (replacement of obsolete vital control processors) has been completed. The next phase is to replace obsolete track circuits and TWC equipment. Upon completion, the Green Line train control system will have been rehabilitated to the same equipment and configuration as the new Crenshaw/LAX Rail Line, thus providing a fully up-to-date system, and conforming across the entire Green Line and Crenshaw/LAX Line.

 

The scope of the work is to replace all 450 existing track circuits which provide train detection and transmit cab signals to maintain safe train speed and safe train separation. Track circuit equipment is located in Train Control and Communication (TC&C) rooms throughout the line. At each of the 19 TC&C rooms, TWC equipment will be replaced comprising of train routing, train berthing, communication, and local control panel equipment. Labor installation will be performed by Metro Wayside Maintenance forces.

 

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

Approval of the recommendations will have a positive impact on safety as the work scope will move forward to ensure compliance with the OEM’s replacement cycle specifications. Further, maintaining the rail system in a State of Good Repair (SGR) is essential to providing a safe and reliable service to riders who ride the Metro Rail system daily. 

 

Financial_Impact

FINANCIAL IMPACT

 

Funding for the contact amount of $18,655,966.78 will come from Capital Project (CP) 205107 - Metro Green Line Train Control Track Circuits and TWC Replacement. The Board approved a Life-of-Project (LOP) budget of $28,851,200 in September 2016. Funding of $1,800,000 is included in the FY18 budget in cost center 3960 Transit Systems Engineering, project 205107, account 53102 - acquisition of equipment.

 

Since this is a multi-year contract, the Project Manager for CP 205107 will ensure that the balance of project funds is budgeted in future fiscal years.

 

Impact to Budget

 

The source of funds for this procurement will come from Metro’s share of TDA Article 4 as well as future Federal, State and local funding sources that are eligible for Rail Capital Projects.  These funding sources will maximize the use of funds for these activities.   

 

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

The Board may choose not to award Contract No. OP43306000, but this is not recommended by staff because without proceeding to replace track circuits and TWC, any failure(s) will cause delays in MGL service as train movements will need to stop until repairs are completed. Not performing or postponing these replacements is not recommended as these rail infrastructure components are safety sensitive; and if not properly maintained, will impact service reliability, passenger safety and comfort. Additionally, unscheduled maintenance repair costs on a per component basis will result in higher operating costs versus reduced costs when performing work as scheduled. 

Next_Steps

NEXT STEPS

 

Upon Board approval, staff will execute Contract No. OP43306000 to Ansaldo STS USA, Inc. to provide the design, manufacturing, and furnishing equipment to Metro for replacement of the track circuits and TWC.

 

 

Attachments

ATTACHMENTS

 

Attachment A - Procurement Summary

Attachment B - DEOD Summary

 

Prepared_by

Prepared by:                      Aderemi Omotayo, DEO, Wayside Systems Engineering and Maintenance, (213) 922-3243

Geyner Paz, Senior Administrative Analyst, (213) 617-6251                     

 

Reviewed_By

Reviewed by:                      James T. Gallagher, Chief Operations Officer, (213) 418-3108

Errol Taylor, Senior Executive Officer, Rail Maintenance and Engineering, (213) 922-3227

Marshall Epler, DEO, Systems Engineering, (213) 617-6232

Debra Avila, Chief Vendor/Contract Management Officer, (213) 418-3051