Legislation Details

File #: 2026-0713   
Type: Contract Status: Agenda Ready
File created: 9/21/2026 In control: Operations, Safety, and Customer Experience Committee
On agenda: 11/19/2026 Final action:
Title: AUTHORIZE the Chief Executive Officer to award a five year firm fixed price Contract No. MA140717(2)000, to Kinkisharyo International LLC (KI), the lowest responsive and responsible proposer, in the Not-To-Exceed (NTE) amount of $962,985.60 for the purchase of 870 traction motor hardware kits to support the P3010 Light Rail Vehicle (LRV) fleet component overhaul, subject to the resolution of any properly submitted protest(s), if any. .
Sponsors: Operations, Safety, and Customer Experience Commit
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - DEOD Summary, 3. Presentation
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.

Meeting_Body

OPERATIONS, SAFETY, AND CUSTOMER EXPERIENCE COMMITTEE

                     NOVEMBER 19, 2026

 

Subject

SUBJECT:                     P3010 FLEET LIGHT RAIL VEHICLE (LRV) TRACTION MOTOR HARDWARE KITS

 

Action

ACTION:                     AWARD CONTRACT

 

Heading

RECOMMENDATION

 

Title

AUTHORIZE the Chief Executive Officer to award a five year firm fixed price Contract No. MA140717(2)000, to Kinkisharyo International LLC (KI), the lowest responsive and responsible proposer, in the Not-To-Exceed (NTE) amount of $962,985.60 for the purchase of 870 traction motor hardware kits to support the P3010 Light Rail Vehicle (LRV) fleet component overhaul, subject to the resolution of any properly submitted protest(s), if any.

.

Issue

ISSUE

 

The P3010 LRV fleet propulsion equipment consists of traction motor, gearbox, with electronic controls that require overhaul at the 600,000-mileage interval as defined by the Original Equipment Manufacturer (OEM). The traction motor hardware kits will replace existing hardware with new components ensuring mechanical connectivity to the truck systems that are under extreme mechanical torque; replacing hardware components ensures equipment reliability and safety to Metro’s passengers. 

 

Background

BACKGROUND

 

The P3010 LRV fleet consists of 235 rail cars manufactured by Kinkisharyo International LLC (KI). The fleet was placed in revenue service between 2016-2023 operating on all of Metro’s light rail lines including A, C, E, K and L lines operating as Metro’s newest and most reliable light rail fleet with over 124,897,140 cumulative fleet miles.

 

The P3010 fleet is currently undergoing a Component Overhaul Program under existing Capital Project # 214009. The Phase-1 projects include four critical vehicle systems: friction brake and air compressor, truck systems (axles, gearbox and traction motors), slewing ring, and fleet battery replacement these projects are planned for completion by end of FY2029.  Phase-2 projects include overhaul of six additional projects that include master controller, high speed circuit breaker, pantograph, coupler, low voltage power supply, and Heating Ventilation Air Conditioning equipment.

 

Discussion

DISCUSSION

 

The P3010 LRV is Metro’s newest, largest, and most reliable vehicle within the 337-rail car fleet. The car builder (Kinkisharyo) and its propulsion equipment manufacture identified a preventive maintenance overhaul at the 600,000-mile interval where specific components within the propulsion equipment are overhauled to ensure continued reliability and to meet vehicle design life of 30-years. There are two power trucks per railcar inclusive of four traction motors that are connected to the truck frame assembly via a mounting plate, rubber busing, large bolt and a specially designed nut that provides the connectivity for these components that are under high torque while operating under harsh environmental operating conditions. This procurement is for the purchase of traction motor hardware kit(s) inclusive of a cylindrical designed nut that is not readily available on the open market, bolts, washers and screws with high tensile strength and zinc plating for rust prevention.

 

Routine maintenance and periodic overhauls of the propulsion equipment are critical for the vehicle operations, on time performance, and passenger safety. Overhaul of the traction motor equipment, inclusive of replacing old hardware with new, is recommended by the OEM to prevent the potential of equipment failure.

 

Metro’s Transit Vehicle Engineering developed details of the traction motor hardware kit outlining scope of the projects, kit requirements, and delivery schedule as provided by RFS component overhaul staff.

 

Upon contract award, the Contractor will provide a total of 870 hardware kits in accordance with industry and with Metro’s engineering standards while achieving design life and reliability goals.

 

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

Safety is of the utmost importance to Metro’s passengers and employees it is therefore necessary to maintain the P3010 LRVs and its critical systems including propulsion equipment are done so by replacing old hardware with new so as not to defer maintenance while meeting Transit Asset Management Federal guidelines on equipment State of Good Repair (SGR). Upon approval of this board action, it will ensure the propulsion equipment continues to provide Metro’s passengers comfort and safety while riding Metro’s light rail system.

 

Financial_Impact

FINANCIAL IMPACT

 

Funding of $132,825.00 for the Contract is included in the FY27 Budget in Rail Fleet Cost Centers for P3010 light rail fleet, Project 214009, and Account 50441.

 

Since this is a multi-year project, the Component Overhaul Superintendent, Division Director, and Senior Executive Officer of Rail Fleet Services will ensure that the balance of funds is budgeted in future years. The Project Manager and Cost Center Manager will also be responsible for budgeting future costs.

 

Impact to Budget 

The source of funds for this action will be Measure M 2% State of Good Repair. These funds are not eligible for Metro Bus and Rail Operations.

 

Equity_Platform

EQUITY PLATFORM

 

This procurement will ensure Metro’s P3010 LRV fleet remains in constant good repair while providing vital rail transportation via the A, C, and E rail lines. These lines include many Equity Focus Communities (EFCs) where disparities may exist in providing residents with access to jobs, housing, education, health, and safety. This includes EFCs located in Long Beach, Compton, Florence-Firestone, Downtown LA, Pomona, Pasadena, Santa Monica, Exposition Park, and South LA.

 

The Disadvantaged Business Enterprise (DBE) goal for this procurement is not applicable given that the U.S. Department of Transportation (USDOT) has issued an Interim Final Rule (IFR) that makes changes to the DBE Program, including suspension of goals and enforcement, effective October 3, 2025. Kinkisharyo International, LLC did not list any Metro certified small businesses to participate in this contract.

 

Vehicle_Miles_Traveled_Outcome

VEHICLE MILES TRAVELED OUTCOME

 

VMT and VMT per capita in Los Angeles County are lower than national averages, the lowest in the SCAG region, and on the lower end of VMT per capita statewide, with these declining VMT trends due in part to Metro’s significant investment in rail and bus transit.* Metro’s Board-adopted VMT reduction targets align with California statewide climate goals, including achieving carbon neutrality by 2045. To ensure continued progress, all Board items are assessed for their potential impact on VMT.

This item supports Metro’s systemwide strategy to reduce VMT through rail vehicle equipment purchase activities that will maintain and further encourage transit ridership, ridesharing, and active transportation. Metro’s Board-adopted VMT reduction targets were designed to build on the success of existing investments, and this item aligns with those objectives.

*Based on population estimates from the United States Census and VMT estimates from Caltrans’ Highway Performance Monitoring System (HPMS) data between 2001-2019.

Implementation_of_Strategic_Plan_Goals

IMPLEMENTATION OF STRATEGIC PLAN GOALS

 

Approval of the P3010 LRV fleet HVAC overhaul supports Strategic Goal 1) Provide high-quality mobility options that enable people to spend less time traveling.

 

The recommendation supports Metro’s Strategic Plan Goal 5) Provide Responsive, Accountable, and Trustworthy governance within the Metro organization.

 

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

An alternative considered is to reuse the traction motor hardware for this overhaul, but this is not recommended, as utilizing existing hardware increases the risk of component and equipment failure. This will negatively impact on revenue service, cause passenger and train operator discomfort, and reduce equipment design life characteristics.   

 

Next_Steps

NEXT STEPS

 

Upon Board Approval, staff will commence work on the traction motor overhaul in accordance with agreed production schedules consisting of 5 kits per month over a 5-year project period.

 

Attachments

ATTACHMENTS

 

Attachment A - Procurement Summary

Attachment B - DEOD Summary

 

Prepared_by

Prepared by:                     Spadafora, Senior Executive Officer, Rail Fleet Services

R. M. Lozano, Superintendent, Rail Fleet Services

M. Dake, Deputy Chief Operations Officer, Maintenance and Engineering

D. Avila, Deputy Chief, Vendor/Contract Management

 

Reviewed_by

Reviewed by:                     C. Cheung, Chief Operations Officer

                     M. Antonelli, Chief Vendor/Contract Management Officer