Type:
|
Project
|
Status:
|
Agenda Ready
|
On agenda:
|
5/15/2024
|
Final action:
|
5/23/2024
|
Title:
|
CONSIDER:
A. APPROVING the Board selected full nine-mile Eastside Transit Corridor Phase 2 with the Lambert Station in the City of Whittier as the terminus for the Project;
B. APPROVING the refinement to the Board selected Locally Preferred Alternative (LPA), a 4.6-mile extension of the existing Metro E-Line to Greenwood Station as the Initial Operating Segment; with design options for Atlantic/Pomona (open underground station) and Greenwood Station (at-grade) and a Maintenance and Storage Facility (including both at-grade and aerial yard lead design options) located in the City of Montebello;
C. CERTIFYING, in accordance with the California Environmental Quality Act (CEQA), the Final Environmental Impact Report (EIR);
D. ADOPTING, in accordance with CEQA, the:
1. Findings of Fact and Statement of Overriding Considerations, and
2. Mitigation Monitoring and Reporting Plan (MMRP); and
E. AUTHORIZING the Chief Executive Officer to file a Notice of Determination with the Los Angel...
|
Indexes:
|
Alignment, Alternatives analysis, Alternatives Analysis study approved by the Board, Atlantic Station, Audit, Board approved Locally Preferred Alternative, Budgeting, Central Los Angeles subregion, Certification, Commerce, Construction, Construction Acquisitions, East LA Civic Center Station, East Los Angeles, Eastside Extension Phase Ii (Project), Environmental Impact Report, Federal Transit Administration, First/Last Mile, Funding plan, Gateway Cities (Southeast LA County) Service Sector, Gateway Cities Council of Governments, Gateway Cities subregion, Gold Line Eastside Transit Corridor Phase 2, Grant Aid, Guidelines, Light rail transit, Location 99, Long range planning, Long Range Transportation Plan, Maintenance, Maintenance facilities, Maintenance of way, Metro Rail E Line, Metro Vision 2028 Plan, Mitigation, Montebello, Notice Of Determination, Notice Of Preparation, Outreach, Park and ride, Partnerships, Pico Rivera, Plan, Program, Project, Project delivery, Safety, Santa Fe Springs, Southern California Association Of Governments, Storage facilities, Surveys, Transfers, Transportation system management, Vehicle miles of travel, Walking, West Whittier-Los Nietos, Westside/Central Service Sector, Whittier
|
Meeting_Body PLANNING AND PROGRAMMING COMMITTEE MAY 15, 2024 Subject SUBJECT: EASTSIDE TRANSIT CORRIDOR PHASE 2 - PROJECT APPROVAL AND CERTIFICATION OF FINAL ENVIRONMENTAL IMPACT REPORT Action ACTION: APPROVE RECOMMENDATIONS Heading RECOMMENDATION Title CONSIDER: A. APPROVING the Board selected full nine-mile Eastside Transit Corridor Phase 2 with the Lambert Station in the City of Whittier as the terminus for the Project; B. APPROVING the refinement to the Board selected Locally Preferred Alternative (LPA), a 4.6-mile extension of the existing Metro E-Line to Greenwood Station as the Initial Operating Segment; with design options for Atlantic/Pomona (open underground station) and Greenwood Station (at-grade) and a Maintenance and Storage Facility (including both at-grade and aerial yard lead design options) located in the City of Montebello; C. CERTIFYING, in accordance with the California Environmental Quality Act (CEQA), the Final Environmental Impact Report (EIR); D. ADOPTING, in accordance with CEQA, the: 1. Findings of Fact and Statement of Overriding Considerations, and 2. Mitigation Monitoring and Reporting Plan (MMRP); and E. AUTHORIZING the Chief Executive Officer to file a Notice of Determination with the Los Angeles County Clerk and the State of California Clearinghouse. Issue ISSUE On April 26, 2024, the Final Environmental Impact Report (Final EIR) for the Eastside Transit Corridor Phase 2 (Project) was released for a 10-day public review period per CEQA guidelines. Metro is the CEQA Lead Agency and has completed the steps required for the Final EIR to be certified by the Board. The Executive Summary of the Final EIR is included in Attachment A. Certification of the Final EIR also includes approval of the Mitigation Monitoring and Reporting Plan (Attachment B) and the Findings of Fact and Statement of Overriding Conditions (Attachment C). The Project is a Measure R and Measure M project that is included in the 2020 Long R... Click here for full text
|