Meeting_Body
PLANNING AND PROGRAMMING COMMITTEE
NOVEMBER 18, 2026
EXECUTIVE MANAGEMENT COMMITTEE
NOVEMBER 19, 2026
Subject
SUBJECT: LA RIVER PATH – LOCALLY PREFERRED ALTERNATIVE (LPA)
Action
ACTION: APPROVE RECOMMENDATION
Heading
RECOMMENDATION
Title
CONSIDER:
A. APPROVING the Locally Preferred Alternative (LPA) for the LA River Path project as Modified Option 2, an 8-mile path between Riverside Drive and Atlantic Boulevard evaluated in the Draft Environmental Impact Report (EIR);
B. APPROVING an approximately 5.5-mile gap closure through two simultaneous Initial Operating Segments (IOS) – the IOS-north between Riverside Drive and Spring Street; and the IOS-South, between Sixth Street and Atlantic Boulevard; and
C. AUTHORIZING staff to work with the City of Los Angeles to bridge the 2.5 mile gap between IOS-north and IOS-south, to prioritize planned Class IV cycle tracks, in combination with the existing on-street bike lanes, which can serve as an interim connection until funding for the off-street river channel paths between Broadway/Spring Street and Sixth Street is secured.
Issue
ISSUE
Metro published a Draft EIR under the California Environmental Quality Act (CEQA) for the LA River Path Project on December 18, 2025. The Board's action to approve the LPA and the two simultaneous IOSs is necessary to continue advancing the Project design for state and federal environmental clearance, which is required for obtaining the United States Army Corps of Engineers (USACE) permit to build and operate the Project, and to allow Metro to support the LA River Governance Model Study (Governance Study). Selecting an LPA does not constitute approval of the project.
Background
BACKGROUND
The Project is included in the 2016 Measure M Expenditure Plan as the LA River Waterway & System Bike path, and in the Metro 2020 Long Range Transportation Plan (LRTP) as the LA River Path - Central LA. At its May 2018 meeting, the Board authorized staff to advance ...