SUBJECT: METRO G LINE IMPROVEMENTS PROJECT STATUS REPORT
Action
ACTION: RECEIVE AND FILE
Heading
RECOMMENDATION
Title
RECEIVE AND FILE status report on Metro G Line Improvements Project.
Issue
ISSUE
This report provides updates related to the scope, schedule, and budget of the Metro G Line Improvements Project (Project). Based on both a joint venture of Stacy Witbeck and Flatiron dba Valley Transit Partners (VTP) and Metro estimates for the cost of Phase 2, allocated funding for the project is not sufficient to cover costs.
Background
BACKGROUND
The Project seeks to provide safe and cost-effective improvements to operating speeds, capacity, and safety, while addressing passenger needs and minimizing disruption to San Fernando Valley residents. The proposed improvements previously communicated to this Board include
* Sepulveda BRT grade separation with aerial station
* Van Nuys BRT grade separation with aerial station and overcrossing at Vesper
* Gates at up to 35 intersections
* Stormwater capture
* Bike Path Improvements
On November 11, 2022, Metro awarded the G Line Improvements Project Progressive Design Build Phase 1 contract to VTP. Between November and July 2023, VTP progressed design through 30% design, conducted field investigations, developed value engineering ideas, and provided Metro with a 30% Opinion of Probable Construction Cost (OPCC). In parallel, Metro's ICE team prepared a 30% estimate. Based on both VTP and Metro estimates for the cost of Phase 2, allocated funding for the project is not sufficient to cover costs.
The project can point to various factors that have created this disparity, including labor and material shortages and rising inflation. The estimates also account for the inherently high cost of doing work within the City of Los Angeles where restrictions on street closures require multi-phase traffic control and phased construction, which significan...
Click here for full text