Meeting_Body
OPERATIONS, SAFETY, AND CUSTOMER EXPERIENCE COMMITTEE
NOVEMBER 19, 2026
Subject
SUBJECT: METRO C/K LINE MAINLINE FASTENER REPLACEMENT PROJECT
Action
ACTION: AWARD CONTRACT
Heading
RECOMMENDATION
Title
AUTHORIZE the Chief Executive Officer to:
AWARD a three-year firm fixed price contract, Contract No. OP138405000 to Balfour Beatty Infrastructure, Inc., the lowest responsive and responsible bidder for the Metro C/K Line Mainline Fastener Replacement Project in the amount of $13,683,652, subject to the resolution of any properly submitted protest(s), if any; and
INCREASE the Life of Project Budget (LOP) for Project 205695 - Metro C/K Line Mainline Fastener Replacement by $4,065,494, increasing the LOP from $17,100,000 to $21,165,494.
Issue
ISSUE
The Metro C Line and the southern segment of the Metro K Line make up a 19.3-mile double-track light rail line operating between Redondo Beach and Norwalk. The existing Type 1 direct fixation (DF) rail fasteners on these segments have been in active light rail service for over 30 years and are reaching the end of their useful life and require replacement to maintain rail operations.
Background
BACKGROUND
The Metro C/K Line Mainline Fastener Replacement Project is a Capital Improvement Project aimed at replacing the original Type 1 direct fixation (DF) rail fasteners across the Metro C Line and the southern segment of the K Line which are approaching the end of their useful life. DF rail fasteners are specialty track equipment, engineered to secure the track running rail to the track support structure such as a concrete track bed in direct fixation track, maintaining track alignment, reducing vibration and providing electrical isolation between the rail and the supporting structure.
The original Type 1 rail fasteners, manufactured by LORD Corp., were installed during the original construction of the C Line and have been in use since revenue service started in 1995. The original fasteners w...