File #: 2015-1069   
Type: Contract Status: Non-Calendar
File created: 6/30/2015 In control: Board of Directors - Regular Board Meeting
On agenda: 7/23/2015 Final action: 7/23/2015
Title: CONSTRUCTION COMMITTEE FORWARDED WITHOUT RECOMMENDATION authorizing the Chief Executive Officer to execute a cost-plus-fixed-fee Contract No. PS2415-3412 with STV, Inc. for the Brighton to Roxford Double Track Project in the amount of $12,500,000 inclusive of all design phases. This contract is for three years.
Sponsors: Planning and Programming Committee
Indexes: Bob Hope Airport, Brighton To Roxford Double Track (Project), Budgeting, Burbank, California High Speed Rail Authority, City of Los Angeles, Construction, Contracts, Double track, Measure R, Memorandum Of Understanding, Metrolink, Metrolink Antelope Valley Line, Pedestrians, Procurement, Professional Services, Project, Proposition 1a, Railroad commuter service, Safety, Subdivisions, Union Pacific Railroad
Attachments: 1. Attachment A - Brighton to Roxford Procurement Summary, 2. Attachment B - Brighton to Roxford - Map
Related files: 2015-0484
Meeting_Body
2nd REVISED
CONSTRUCTION COMMITTEE
July 16, 2015

Subject/Action
SUBJECT: BRIGHTON TO ROXFORD DOUBLE TRACK PROJECT

ACTION: APPROVE CONTRACT FOR THE BRIGHTON TO ROXFORD DOUBLE TRACK PROJECT

Heading
RECOMMENDATION

Title
CONSTRUCTION COMMITTEE FORWARDED WITHOUT RECOMMENDATION authorizing the Chief Executive Officer to execute a cost-plus-fixed-fee Contract No. PS2415-3412 with STV, Inc. for the Brighton to Roxford Double Track Project in the amount of $12,500,000 inclusive of all design phases. This contract is for three years.

Issue
ISSUE

It is the intent of Metro Regional Rail to award a professional services contract to provide engineering services for completion of the environmental clearance documents, preliminary engineering documents, permitting, and final design engineering of the Brighton to Roxford Double Track Project. In addition the work includes the development of the necessary construction documents for the Project, as well as design support services during bid and construction.

Discussion
DISCUSSION

Background

Metro is developing the Brighton to Roxford Double Track project (Project) in Los Angeles, CA, between milepost (MP) 12.7 and MP 2 3.6 on the Valley Subdivision. At this time, Metro is proceeding with the environmental clearance and the development of Plans, Specifications, and Estimates (PS&E) for construction of the Project.

The Project includes approximately 10.4 miles of new double track beginning at Control Point (CP) Brighton, at MP 12.7, and ending at CP Roxford, at MP 23.6 on the Valley Subdivision of the Antelope Valley Line. At the east end of the Project near CP Brighton, the scope of work includes connecting the new double track to the Brighton Siding extension that is being developed as part of the Empire Avenue and Buena Vista Grade Separation Project. The scope of work also includes connection to the 6,109 foot existing Sun Valley Siding between CP McGinley and CP Sh...