File #: 2015-0374   
Type: Policy Status: Withdrawn
File created: 4/28/2015 In control: Planning and Programming Committee
On agenda: 7/15/2015 Final action: 7/15/2015
Title: WITHDRAWN: REVISE the Board's Unified Cost Management Process and Policy to add a new Section 12 and a new Attachment A, directing that if cost increases to the specified Measure R highway projects cannot be mitigated, that 50 percent of cost increases will be addressed from the countywide program and 50 percent of the cost increases are subject to the corridor and subregional cost containment portions of the existing policy.
Indexes: Activity centers, Budgeting, Long range planning, Long Range Transportation Plan, Los Angeles Union Station, Measure R, Measure R Cost Management Process and Policy, Metro Rail A Line, Motion / Motion Response, Peak periods, Policy

Meeting_Body

PLANNING AND PROGRAMMING COMMITTEE

JULY 15, 2015

 

 

Subject/Action

SUBJECT:    UNIFIED COST MANAGEMENT PROCESS AND POLICY

                                            REVISIONS FOR MEASURE R HIGHWAY PROJECTS

 

ACTION:                       APPROVE REVISIONS

 

Heading

RECOMMENDATION

 

Title

WITHDRAWN: REVISE the Board’s Unified Cost Management Process and Policy to add a new Section 12 and a new Attachment A, directing that if cost increases to the specified Measure R highway projects cannot be mitigated, that 50 percent of cost increases will be addressed from the countywide program and 50 percent of the cost increases are subject to the corridor and subregional cost containment portions of the existing policy.

 

Issue
ISSUE

 

At its January 22, 2015 meeting, the Board approved Item 24 which amended the Board’s Unified Cost Management Process and Policy to adjust subregional boundaries, create a Regional Facilities Planning Area (major ports, airports, and Los Angeles Union Station), and modify the Unified Cost Management Process and Policy to ensure that cost increases for Measure R funded projects located in the Regional Facilities Planning Area are not the responsibility of subregional areas.

 

At that meeting, the Board approved Motion 24.1 (Attachment B) directing staff to analyze whether other projects should be added to the Regional Facilities Planning category, and if such projects are highways, propose a cost sharing methodology to address any cost increases.

 

Discussion
DISCUSSION

 

In the 2001 Long Range Transportation Plan, subregional planning areas were established for plan analysis purposes.  At the direction of the Board, staff presented Item 24 at the January 22, 2015 Board Meeting to update subregional planning area boundaries in proximity to the South Bay Cities Subregional Planning Area and to establish a new Regional Facilities Planning Area.  Staff recommended that the Regional Facilities Planning Area include major Los Angeles County airports, seaports, and Los Angeles Union Station as these are major regionally significant public facilities that are activity centers that have a sphere of influence beyond an individual subregion, often with regional, statewide, or national significance.

 

At the Board meeting, concern was raised about existing cost containment policy requirements that would make the specified Measure R highway project cost increases the responsibility of subregions.  It was noted that subregions have no control over the specified highway project cost increases, as these projects are typically constructed by Caltrans to serve regional travel.  It was further noted that highway improvements have benefits beyond an individual subregion, as many highways extend throughout the region, and some even extend statewide or nationwide.

 

In reviewing the Regional Facilities Planning Area project category, we do not recommend adding other projects, such as highways, to this category.  The Regional Facilities category was designed to include regionally significant public activity centers rather than primary components of the regional transportation system.

 

We have reviewed, however, whether a cost sharing methodology could be considered for cost increases to the specified Measure R highway projects. We have noted that there is a regional and subregional component to trips that may warrant a cost sharing methodology. Metro’s 2009 Long Range Transportation Plan technical analysis shows that generally half the peak-period trips generated within a subregion stay within a sub-region and half the peak-period trips generated travel to other subregions (Attachment C).   This provides technical justification for a 50 percent countywide/50 percent subregional cost sharing concept for specified Measure R highway projects that have cost increases. Those Measure R Highway Projects that would be eligible under the cost sharing methodology above meet three criteria:  1) they are on the State highway system, 2) they are regional projects defined as highway mainline projects that increase capacity, and 3) they have funding through construction.   (See Attachment D)

 

The recommended cost containment/cost sharing methodology for the specified Measure R highway projects that have cost increases follow a three step cost containment process to 1) explore value engineering/scope changes and local funding resources, 2) work with state and federal agencies to seek additional state and federal funding resources, and 3) to apply a 50 percent countywide/50 percent subregional cost sharing method to any remaining shortfall (Attachment A).

 

Determination_Of_Safety_Impact
DETERMINATION OF SAFETY IMPACT

 

Changing the Unified Cost Management Process and Policy will not have any adverse safety impacts on our employees and patrons. 

 

Financial_Impact
FINANCIAL IMPACT

 

This action does not create a change in project cost increases.  It changes how cost increases are assigned for specified Measure R highway projects between countywide program funds and subregional cost containment requirements.

 

Impact to Budget

 

There is no impact to the FY 15 budget.

 

 

Alternatives_Considered
ALTERNATIVES CONSIDERED

 

The Board could chose not to make the recommended changes for the specified Measure R Highway Projects that incur a cost increase.  The Board could also apply this procedure to both Measure R highway and transit projects that incur cost increases.  This staff recommendation, however, is consistent with the Board motion to address a cost sharing procedure for Measure R highway projects.

 

Next_Steps
NEXT STEPS

 

Upon Board approval of Policy revisions, the highway cost containment process identified in Section 12 for the specified Measure R highway projects, will be applied to Measure R highway project cost overruns

 

Attachments

ATTACHMENTS

 

Attachment A - Unified Cost Management Process and Policy for Measure R Projects

Attachment B - Motion 24.1

Attachment C - Peak Period Trip Productions (2009 Long Range Transportation Plan) 

Attachment D - Measure R Highway Project Criteria

 

Prepared_by

Prepared by:                                          Brad McAllester, Executive Officer (213) 922-2814

David Yale, Managing Executive Officer, (213) 922-2469

 

 

Reviewed_By

Reviewed By: Martha Welborne, Chief Planning Officer