File #: 2015-0577   
Type: Budget Status: Non-Calendar
File created: 5/13/2015 In control: Board of Directors - Regular Board Meeting
On agenda: 7/23/2015 Final action: 7/23/2015
Title: CONSTRUCTION COMMITTEE FORWARDED WITHOUT RECOMMENDATION amending the FY 16 Budget to add $800,000 to Project 405556 Systemwide Planning in Cost Center 4330, Countywide Planning and Development to cover the design costs for modifications to the Crenshaw/LAX (C/LAX) station design for consistency with the Systemwide Station Design.
Sponsors: Construction Committee
Indexes: Budget, Budgeting, Construction, Contracts, Crenshaw/LAX Transit Corridor Project, Further Development Of Systemwide Design Elements, Including Below-Grade Station And Aerial Stations Plaza Design Standards (Project), Los Angeles International Airport, Maintenance, Metro Crenshaw Line, Metro Exposition Line, Metro Green Line, Metro Rail C Line, Metro Rail E Line, Metro Rail K Line, Project, Transportation Development Act - Article 4, Transportation Development Act of 1971
Attachments: 1. Attachment A Crenshaw_LAX Plaza Ticketing Area.pdf
Meeting_Body
CONSTRUCTION COMMITTEE
JULY 16, 2015



Subject/Action
SUBJECT: CRENSHAW/LAX TRANSIT PROJECT

ACTION: AMEND FY16 BUDGET

Heading
RECOMMENDATION

Title
CONSTRUCTION COMMITTEE FORWARDED WITHOUT RECOMMENDATION amending the FY 16 Budget to add $800,000 to Project 405556 Systemwide Planning in Cost Center 4330, Countywide Planning and Development to cover the design costs for modifications to the Crenshaw/LAX (C/LAX) station design for consistency with the Systemwide Station Design.

Issue
ISSUE

A notice-to-proceed was issued to Walsh/Shea Corridor Constructors (WSCC) on September 10, 2013 for the C0988 contract. The C0988 contract included the Metro Systemwide Station Design Concept report as a requirement. Since that time, Metro has further developed the Systemwide Station Design into drawings and adopted the new standard drawings as part of Metro Baseline documents that is required for all future light rail stations. Additionally, Board policy requires that all Light Rail Stations have fare gates which were not included in the Systemwide Station Design Concept report or the C0988 contract. For the most part, the C/LAX stations incorporate the intent of the Systemwide Station Design. The design modifications recommended will bring four of the C/LAX stations into better conformity with the Systemwide Station Design. Staff is requesting Board authorization to amend the FY16 Budget to add $800,000 using Countywide Systemwide Planning funds to modify portions of the platform configuration and the Florence/La Brea ticketing structure design as shown in Attachment.

Discussion
DISCUSSION
Throughout the Los Angeles region, Metro's station architecture and finishes vary dramatically from station to station, resulting in the lack of a clear architectural identity for Metro Rail, not to mention higher maintenance costs. With Metro's rail system rapidly expanding, staff procured an architectural design team to conduct an inde...