File #: 2016-0727   
Type: Contract Status: Passed
File created: 9/1/2016 In control: Construction Committee
On agenda: 11/17/2016 Final action: 12/1/2016
Title: AUTHORIZE the Chief Executive Officer (CEO) to award a three-year cost-plus fixed fee Contract No. PS601830026445 for Construction Management Support Services for Metro Rail Projects with Destination Enterprises, Inc. in the amount not to exceed $3,000,000, inclusive of two one-year options, subject to resolution of protest(s) if any. Destination Enterprises, Inc. is a certified SBE with Metro.
Sponsors: Construction Committee
Indexes: Artwork Replacement + Renovations On Mbl- 3 Stations: Grand, 5Th St, 103Rd St/Watts (Project), Bicycle Access Improvements - Rail (Project), Bicycle Lockers/Racks For Mta Stations (Project), Bicycling, Budgeting, Capital Project, Capital Project Funds, Construction, Construction management, Construction Support, Contract administration, Contracts, Cost Plus - Fixed Fee Construction Management Contract, Cost-plus Contract, Div 21 Midway Yard, Main Shop, Blowdown Modification (Project), Division 21, Fiber Optic Main Loop Upgrade (Project), Hollywood Way Station (Project), Light rail transit, Mbl Long Beach Yard Signal System Rehab (Project), Mbl Ocs Rehabilitation (Project), Mbl Pedestrian Safety Enhancements At Grade Crossings (Project), Mbl Signal System Rehabiliation (Project), Metro Blue Line, Metro Gold Line, Metro Green Line, Metro Rail A Line, Metro Rail B Line, Metro Rail C Line, Metro Rail L Line, Metro Red Line, Mgl Emergency Trip System (Project), Mgl Negative Grounding Devices (Project), North Long Beach Duck Bank Upgrade Phase Ii (Project), Pgl 5Th Pasadena Station Ada Ramp (Project), Platform Track Intrusion Detection System (Project), Procurement, Professional Services, Project management, Railroad facilities, Rehabilitation (Maintenance), Replace Corroded Rail In Trackway Of Metro Blueline From Willow To Transit Mall (Project), Replace Existing Corrosion Protection Systems With New System (Project), Small Business Enterprise, Sound Enclosure For Lrt Freeway Stations (Project), South Pasadena Station, Universal City Stn Nth Entrance Knock-Out Panel (Project), Universal City/Studio City Station, Vertical Systems Modernization Elevators (Project)
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - DEOD Summary

Meeting_Body

CONSTRUCTION COMMITTEE

                                                                                                                              NOVEMBER 17, 2016

 

Subject/Action

SUBJECT:                     CONSTRUCTION MANAGEMENT FOR RAIL FACILITIES CAPITAL PROGRAM

 

ACTION:                     AWARD AND EXECUTE CONTRACT FOR CONSTRUCTION MANAGEMENT SUPPORT SERVICES

 

Heading

RECOMMENDATION

 

Title

AUTHORIZE the Chief Executive Officer (CEO) to award a three-year cost-plus fixed fee Contract No. PS601830026445 for Construction Management Support Services for Metro Rail Projects with Destination Enterprises, Inc. in the amount not to exceed $3,000,000, inclusive of two one-year options, subject to resolution of protest(s) if any.  Destination Enterprises, Inc. is a certified SBE with Metro.

 

Issue

ISSUE

 

The Los Angeles County Metropolitan Transportation Authority (Metro) requires professional services from a qualified Construction Management Support Services (CMSS) firm to support the design review, construction management, and administration of the construction contracts for various Metro Rail projects to ensure compliance with contract requirements and government regulations.

 

Discussion

DISCUSSION

 

On April 8, 2016, requests for proposals were issued for CMSS services to assist Metro in managing the construction of Rail Facilities Capital Projects. The CMSS Contract is a cost-plus fixed fee contract for a term of three (3) years with two one-year options. If Metro decides to exercise the additional option years in the CMSS contract, rates for the option years will be negotiated prior to the end of the base contract period. Option 1 will be to extend the CMSS services and option 2 will be for contract closeout. This contract was procured as a Small Business Enterprise Set- Aside. 

Since the CMSS contract is a cost-plus fixed fee contract, consultant services will be performed using Annual Work Plans (AWP).  Each AWP will include negotiated direct labor, overhead rates, general and administrative expenses, fee, and negotiated hours for the level of effort to match the work.  The AWPs will be funded from the existing project budgets and take into consideration all information available at the time of planning plus applicable time constraints on the performance of the work.  Metro shall ensure that strict project controls are in place prior to approving each AWP to closely monitor the Consultant’s budget and AWP schedules.  No funds will be obligated until the AWP is approved against each particular capital project. 

The primary role of the CMSS is to provide highly skilled and qualified individuals to assist Metro with Construction Management but also includes other tasks such as the administration of construction contracts. The CMSS staff will be part of a fully integrated Construction Management team working with Metro in the project and field offices.

 

The CMSS contract will provide some or all of the services for current rail projects, future rail projects and other rail-related capital projects, but not limited to the following listed projects:

 

204072 Metro Blue Line Artwork Renovations

204083 LRT Stations Sound Enclosures

204089 Bicycle Lockers & Racks for Metro Rail Stations

204090 Bicycle Access Improvements - Rail

204094 Division 21 Midway Yard Improvements

204117 System Wide Elevator Installations

204119 PGL South Pasadena Station Northbound Platform ADA Ramp

204120 Universal City Station North Entrance Knock-out Panel

205055 MGL Emergency Trip System

205056 MGL Negative Ground Devices

205070 Fiber Optic Main Loop Upgrade

205073 Metro Blue Line Yard Signal System

205088 Long Beach Bank Upgrade Phase II

205092 System Wide Corrosion Protection System Replacement

205093 Metro Blue Line Rail Replacement and Booting

205103 Platform Track Intrusion Detection System

205104 Metro Blue Line Pedestrian Safety Enhancement at Grade Crossing

211002 Metro Blue Line Overhead Catenary System Rehabilitation

211005 Metro Blue Line Signal System Rehabilitation

460090 Bob Hope/Hollywood Way Metro Link Station

Staff estimates that the CMSS for the Metro Rail Projects will be required beginning approximately in the Fall of 2016, immediately after award of the contract.

 

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

This Board action will not have an adverse impact on safety standards for Metro.

Financial_Impact

FINANCIAL IMPACT

 

The funding for this contract is included in cost center 8510, Construction Procurement, under various Rail Facility Capital project numbers. AWP’s under this contract will be funded within the life-of-project (LOP) budgets for each individual capital project. As such, approval of this action will not increase the LOP budgets of any individual capital projects. Since this is a multi-year contract, respective project managers, the Cost Center Manager and Chief Program Management Officer will be accountable for budgeting the contract cost in future years, including any options exercised.

Impact to Budget

The funding for this action comes from various approved Rail Facility Capital Project budgets, which are funded by various sources including Federal 5307, TDA 4, Proposition A  and Proposition C. The funds have been specifically set aside for these uses as part of the Capital Program. Approval of this action will not impact the bus and rail operating budget.

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

The Board may reject the recommendation.  Staff does not recommend this alternative, as rejection will require an extensive hiring effort to provide permanent staff to fill the required positions, several of which anticipated to be temporary.  This would not be cost effective and could cause delays, since many of the CMSS staff are only required on a periodic basis for peak workloads and specific tasks over the life of the project.

 

Next_Steps

NEXT STEPS

 

After Board approval of this CMSS Contract, the Contracting Officer will award the contract in accordance with Metro Procurement Policies and Procedures.

Attachments

ATTACHMENTS

 

Attachment A - Procurement Summary

Attachment B - DEOD Summary

 

Prepared by:

 

James Gleig, Deputy Executive Officer, Construction Management, (213) 922-7453

Timothy P. Lindholm, Executive Officer, Capital Projects, (213) 922-7297

 

Reviewed_By

Reviewed by:

                      

Debra Avila, Chief Vendor/Contract Management Officer, (213) 418-3051

Richard Clarke, Chief Program Management Officer (213) 922-7447