File #: 2017-0154   
Type: Project Status: Passed
File created: 3/3/2017 In control: Planning and Programming Committee
On agenda: 4/19/2017 Final action: 5/25/2017
Title: CONSIDER: A. APPROVING an updated Project Definition for Environmental Clearance, including three alternatives: 1. SR 60 North Side Design Variation Alternative; 2. Washington Boulevard Alternative with Atlantic Below-Grade Option; and 3. Combined Alternative with both SR 60 and Washington Boulevard via Atlantic Segments; and B. RECEIVING AND FILING the Eastside Phase 2 Technical Study Report. Attachment D contains the Executive Summary. The full report is available upon request.
Sponsors: Planning and Programming Committee
Indexes: Activity centers, Alignment, Alternatives analysis, Atlantic Station, Board approved Contract, Budgeting, Catchment areas, Central Los Angeles subregion, Commerce, Construction, Construction Acquisitions, Curbs, East LA Civic Center Station, East Los Angeles, Eastside Extension Phase Ii (Project), Environmental Impact Report, Environmental impact statements, Gateway Cities (Southeast LA County) Service Sector, Gateway Cities subregion, Gold Line Eastside Transit Corridor Phase 2, Guideways, Light rail transit, Maintenance facilities, Metro Gold Line, Metro Rail A Line, Metro Rail E Line, Metro Rail L Line, Montebello, Monterey Park, Motion / Motion Response, Outreach, Park and ride, Professional Services, Project, Railroad facilities, Ridership, South El Monte, SR-60, Surveys, Transit centers, Transit Oriented Community, Transmissions, Travel time, Westside/Central Service Sector, Whittier, Zoning
Attachments: 1. Attachment A - July 2015 Board Motion, 2. Attachment B - Project Schedule, 3. Attachment C – Map of NorthSouth Route Options for Washington Boulevard, 4. Attachment D – Eastside Phase 2 Route Options Screening Analysis and Community Outreach Executive Summary, 5. Presentation Item 25-Eastside
Related files: 2017-0395
Meeting_Body
REGULAR BOARD MEETING
MAY 25, 2017

Subject/Action
SUBJECT: EASTSIDE TRANSIT CORRIDOR PHASE 2

ACTION: APPROVE TECHNICAL STUDY RECOMMENDATIONS

Heading
RECOMMENDATION

Title
CONSIDER:

A. APPROVING an updated Project Definition for Environmental Clearance, including three alternatives:

1. SR 60 North Side Design Variation Alternative;

2. Washington Boulevard Alternative with Atlantic Below-Grade Option; and

3. Combined Alternative with both SR 60 and Washington Boulevard via Atlantic Segments; and

B. RECEIVING AND FILING the Eastside Phase 2 Technical Study Report. Attachment D contains the Executive Summary. The full report is available upon request.

Issue
ISSUE

In November 2014, the Board received the Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/Report (EIS/EIR) and approved carrying forward to further study two build alternatives: the SR 60 North Side Design Variation (NSDV) Alternative and the Washington Boulevard Alternative. Staff was directed to address comments received from Cooperating and Public Agencies, identify an alternative to the Washington Boulevard Garfield Alternative aerial alignment, and analyze the feasibility of operating both alternatives.
At the July 2015 meeting, the Board approved a Contract Modification for the Metro Eastside Transit Corridor Phase 2 Project to undertake this work including community outreach to support the Technical Study. The Board also approved a motion (Attachment A) directing staff to provide bi-monthly updates on the project covering:
* analysis and refinement of project alternatives,
* project schedule and milestones,
* status reports on work with third-party agencies, and
* community outreach.

The Eastside Phase 2 Technical Study is now complete, and includes findings and recommendations for Board consideration. Specifically, Board approval is being sought to adopt the updated Project Definition, which includes a slightly revised SR 60 North Side Design V...