File #: 2018-0150   
Type: Contract Status: Agenda Ready
File created: 3/27/2018 In control: System Safety, Security and Operations Committee
On agenda: 5/17/2018 Final action:
Title: CONSIDER: A. AUTHORIZING the Chief Executive Officer to award a 31 month, indefinite delivery, indefinite quantity Contract No. MA46603 to KB Powertech Corporation, USA for overhaul services of the Siemens P2000 Light Rail Vehicle (LRV) Auxiliary Inverter Assembly for a total not-to-exceed amount of $999,607, subject to resolution of protest(s), if any; and B. AWARDING a sole source procurement, pursuant to Public Utilities Code Section 130237 for component overhaul services of the Siemens P2000 LRV Auxiliary Inverter Assembly Overhaul the Original Equipment Manufacturer (OEM), to KB Powertech Corp. (REQUIRES TWO-THIRDS VOTE OF THE FULL BOARD)
Sponsors: System Safety, Security and Operations Committee
Indexes: Budgeting, Contractors, Contracts, Guidelines, Light rail vehicles, Maintenance, P2000 Component Overhaul (Project), Procurement, Purchasing, Rail Fleet Services, Rolling stock, Safety, Safety and security, Safety vehicles, State Of Good Repair, System safety, Testing, Vehicle operations, Vehicle safety, Voltage
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - DEOD Summary
Related files: 2018-0347

Meeting_Body

SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE

MAY 17, 2018

Subject

SUBJECT:                     P2000 AUXILIARY INVERTER ASSEMBLY OVERHAUL

Action

ACTION:                     APPROVE CONTRACT AWARD

 

Heading

RECOMMENDATION

 

Title

CONSIDER:

 

A.                     AUTHORIZING the Chief Executive Officer to award a 31 month, indefinite delivery, indefinite quantity Contract No. MA46603 to KB Powertech Corporation, USA for overhaul services of the Siemens P2000 Light Rail Vehicle (LRV) Auxiliary Inverter Assembly for a total not-to-exceed amount of $999,607, subject to resolution of protest(s), if any; and

 

B.                     AWARDING a sole source procurement, pursuant to Public Utilities Code Section 130237 for component overhaul services of the Siemens P2000 LRV Auxiliary Inverter Assembly Overhaul the Original Equipment Manufacturer (OEM), to KB Powertech Corp.

 

(REQUIRES TWO-THIRDS VOTE OF THE FULL BOARD)

 

Issue

ISSUE

 

The P2000 LRV fleet auxiliary inverter assembly is due for overhaul services as recommended by the OEM established guidelines. This procurement is for the sole purpose of purchasing overhaul services for existing equipment already in operational use. Execution of this component overhaul acquisition will safeguard passenger safety while maintaining equipment performance in a continuous State of Good Repair (SGR). 

 

Discussion

DISCUSSION

 

The Siemens P2000 LRVs are in its 17th year of operation and consists of a total of seven procurements for the overhaul of the major vehicle systems inclusive of power axle, gearbox, traction motors, couplers, friction brake & air compressor, auxiliary inverter, and the propulsion system (gate driver board) overhaul.  The auxiliary inverter overhaul is sixth in succession of the seven component overhaul procurements requiring board approval.  This procurement is for the professional services to complete the overhaul of up to 52 auxiliary inverter assemblies for the P2000 fleet as recommended by the OEM established guidelines. In order to ensure continued safety and performance of the auxiliary inverter assembly, an overhaul of the equipment is required at the vehicle mid-life service interval.  The auxiliary inverter is an integral vehicle system necessary for safe operation of the vehicle that inverts the overhead catenary supply voltage of 750 (VDC) to 208/110 (VAC) supplying interior lighting, power to auxiliary motors, and supplies power for the Low Voltage Power Supply charging the 37.5 VDC battery and numerous control systems.

The overhaul consists of disassembly of the entire assembly down to circuit board and component level, a thorough cleaning and inspection of components, load testing of modules, replacement of electrolytic capacitor and lithium batteries, component replacement as needed, replacement of seals and gaskets, and a comprehensive testing of the entire inverter assembly for sustained output voltages.

Rail Fleet Services (RFS) Engineering developed a Statement of Work (SOW) for the contractor to follow while performing the overhaul.  The contractor will perform overhaul services in accordance with predefined schedule at two (2) inverters per month.  

Determination_Of_Safety_Impact

DETERMINATION OF SAFETY IMPACT

 

Passenger and employee safety are of the utmost importance to Metro and, therefore, it is imperative to maintain the P2000 fleet to a constant SGR.  The auxiliary inverter assembly overhaul is in support of routine maintenance and an established component overhaul program.  This effort will ensure that the fleet is maintained in accordance with OEM recommendations, regulatory standards, and within Metro’s internal Corporate Safety policies and procedures.

Financial_Impact

FINANCIAL IMPACT

 

The approved Life-of-Project (LOP) budget for the P2000 Fleet Component Overhaul Program (number 206006) is $26,360,100 established in 2012. Funding of $999,607 for this Contract is included in the FY19 budget in Cost Centers 3941 and 3943, Rail Fleet Services Maintenance, account 50441, Parts - Revenue Service. Since this is a multi-year contract, the Cost Center Manager and Project Manager will ensure that the balance of funds are budgeted in future years.

Impact to Budget

The current source of funds for this action is Prop A Bonds.  This will maximize funding leverage given allowable funding provisions.

Alternatives_Considered

ALTERNATIVES CONSIDERED

 

The auxiliary inverter assembly is a safety critical system that inverts the vehicle supply voltage of 750 VDC to 208/110 VAC critical for safe operation of the vehicle and is required to be overhauled per the OEM recommended interval and regulatory requirements.  Deferring the auxiliary inverter assembly overhaul is not recommended as vehicle performance and passenger safety could be adversely affected. 

Next_Steps

NEXT STEPS

 

Overhaul of the P2000 LRV auxiliary inverter assembly will continue in accordance with RFS Component Overhaul schedule requirements.  Upon board approval staff will execute Contract No. MA46603 to provide overhaul services of the P2000 LRV auxiliary inverter assembly. The project is scheduled to commence July 2018.

Attachments

ATTACHMENTS

 

Attachment A - Procurement Summary

Attachment B - DEOD Summary

 

Prepared_by

Prepared by:                      Bob Spadafora, Sr. Executive Officer, Rail Fleet Services, (213) 922-3144

                     Richard M. Lozano, Sr. Director, Rail Fleet Services, (310) 816-6944

 

Reviewed_By

Reviewed by:                      James T. Gallagher, Chief Operations Officer, (213) 418-3108

                     Debra Avila, Chief Vendor/Contract Management Officer, (213) 418-3051