File #: 2020-0199   
Type: Contract Status: Agenda Ready
File created: 3/11/2020 In control: Planning and Programming Committee
On agenda: 5/20/2020 Final action:
Title: CONSIDER: A. RECEIVING AND FILING the Centinela Grade Separation Screening Analysis for Design Concepts/Engineering Design Report; B. APPROVING Project Definition as an Aerial Grade Separation at the Florence/Centinela Crossing of the Crenshaw/LAX Line supported by Bus Bridging during the Construction Period; C. FILING an environmental Statutory Exemption pursuant to CEQA; D. Authorizing staff to proceed with preliminary engineering and final design services on the Centinela Grade Separation. This is not a request for construction funding.
Sponsors: Planning and Programming Committee, Executive Management Committee
Indexes: Budgeting, Construction, Contracts, Crenshaw/LAX Transit Corridor Project, Metro Exposition Line, Metro Rail C Line, Project, Strategic planning
Attachments: 1. Attachment A - Map of Inglewood Projects, 2. Attachment B- Centinela Grade Separation Screening Analysis for Design Concepts Report, 3. Attachment C - Rendering of Above-Ground Aerial Grade Separation, 4. Presentation
Date Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.
Meeting_Body
PLANNING AND PROGRAMMING COMMITTEE
MAY 20, 2020
EXECUTIVE MANAGEMENT COMMITTEE
MAY 21, 2020

Subject
SUBJECT: CENTINELA GRADE SEPARATION

Action
ACTION: APPROVE RECOMMENDATIONS

Heading
RECOMMENDATION

Title
CONSIDER:

A. RECEIVING AND FILING the Centinela Grade Separation Screening Analysis for Design Concepts/Engineering Design Report;

B. APPROVING Project Definition as an Aerial Grade Separation at the Florence/Centinela Crossing of the Crenshaw/LAX Line supported by Bus Bridging during the Construction Period;

C. FILING an environmental Statutory Exemption pursuant to CEQA;

D. Authorizing staff to proceed with preliminary engineering and final design services on the Centinela Grade Separation. This is not a request for construction funding.

Issue
ISSUE

In December 2018 the Metro Board approved the initiation of an engineering and environmental study to support development of the Centinela Grade Separation (Item #2018-0245). The study has been conducted in cooperation with the City of Inglewood and has included the development of 15% design and a Funding and Delivery Strategy Plan for the project.

Board approval is needed to approve funding to advance engineering design to include the preparation of construction bid documents. Approval of a funding plan is needed to support final design and construction activities for the grade separation with minimal impacts to the construction, opening and operation of the Crenshaw/LAX (CLAX) LRT Project.

Background
BACKGROUND

History
The Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for CLAX
was completed in 2011. Applying Metro's Grade Crossing Policy in 2011 resulted in a
determination that an at-grade crossing application was appropriate. In 2013 the
California Public Utilities Commission (CPUC) granted approval of the at-grade crossing
pending inclusion of several supplemental measures intended to improve safety and
increase queuing and traffic capacity. The final...

Click here for full text