Preamble
Motion by:
DIRECTORS GARCIA, GARCETTI, SOLIS, HAHN, RIDLEY-THOMAS, AND BONIN
Related to Item 24: Regional Connector Service Plan
Regional Connector Operations
The Regional Connector, which is scheduled to open in 2022, will provide single-seat rides through downtown Los Angeles between different regions throughout the county. The connectivity it promises will be transformative for tens of thousands of Metro light rail riders who today have to transfer 1-2 times each way to complete a single trip, adding significant time and variability to their travel.
The Metro A Line (Blue), E Line (Expo), and L Line (Gold) currently serve tens of thousands of riders daily, in the midst of a pandemic that has significantly reduced overall ridership.
In response to Board Motion 37 (February 2017) Metro committed to a 10-minute end-to-end travel time reduction along the A Line, between Downtown Long Beach and 7th Street/Metro Center. Some of that commitment has been achieved through a Long Beach signal prioritization project, that has shaved 3-5 minutes off the travel time in each direction.
Further in response to Board Motion 37 (July 2017), Metro staff recognized the Washington/Flower Wye junction as a source of significant delays for both the A and E Lines. Staff identified three alternatives for further evaluation and the project was included in the 28 by '28 initiative, although no funding sources were identified to proceed with any of them.
In 2018, Metro staff engaged in a collaboration with Los Angeles Department of Transportation (LADOT) staff in order to improve travel speeds and consistency along the E Line. Among several promising ideas, this collaboration has yielded concepts to improve reliability on the Washington Blvd segment of the A Line.
As part of the Regional Connector Operating Plan, Metro staff estimate the need for additional one-way travel de...