File #: 2022-0862   
Type: Contract Status: Passed
File created: 12/20/2022 In control: Planning and Programming Committee
On agenda: 2/15/2023 Final action: 2/23/2023
Title: AUTHORIZE the Chief Executive Officer to execute Modification No. 4 to Contract No. AE67085000, Sepulveda Transit Corridor Environmental Review and Conceptual Engineering, with HTA Partners (HTA), a joint venture between HNTB Corporation, Terry A. Hayes Associates Inc., and AECOM Technical Services, Inc., in the amount of $4,108,638.43 for additional technical services to support the environmental phase for all six alternatives and the refinement of the Alternative 6 design, increasing the total contract value from $54,592,930 to $58,701,568.43.
Sponsors: Program Management (Department), Maria Luk
Indexes: Alignment, Alternatives analysis, Budgeting, California Environmental Quality Act, Contractors, Contracts, Los Angeles International Airport, Measure M, Measure R, Metro Rail E Line, Metrolink, Monorail, National Environmental Policy Act Of 1969, Pre-Development Agreement, Procurement, Program Management, Project, Project Status Report, Railroad commuter service, San Fernando, San Fernando Valley Service Sector, San Fernando Valley subregion, Sepulveda Transit Corridor (Project), Strategic planning, Travel time
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - Contract Modification Change Order Log, 3. Attachment C - DEOD Summary, 4. Presentation
Meeting_Body
PLANNING AND PROGRAMMING COMMITTEE
February 15, 2023

Subject
SUBJECT: SEPULVEDA TRANSIT CORRIDOR

Action
ACTION: APPROVE RECOMMENDATION

Heading
RECOMMENDATION

Title
AUTHORIZE the Chief Executive Officer to execute Modification No. 4 to Contract No. AE67085000, Sepulveda Transit Corridor Environmental Review and Conceptual Engineering, with HTA Partners (HTA), a joint venture between HNTB Corporation, Terry A. Hayes Associates Inc., and AECOM Technical Services, Inc., in the amount of $4,108,638.43 for additional technical services to support the environmental phase for all six alternatives and the refinement of the Alternative 6 design, increasing the total contract value from $54,592,930 to $58,701,568.43.

Issue
ISSUE

The execution of Contract Modification No. 4 will allow for the preparation of documents necessary for state and federal environmental processes. It would also allow Metro to perform the necessary design work and analysis associated with Alternative 6. These technical services should be conducted by the existing contractor team for continuity and to avoid any delays associated with procuring a separate contractor.

Background
BACKGROUND

In 2016, Los Angeles County voters approved the Measure M Expenditure Plan, which included transit improvements between the San Fernando Valley, the Westside, and Los Angeles International Airport (LAX). The Measure provides for the implementation of the Sepulveda Transit Corridor Project in two phases: the first segment between the San Fernando Valley and the Westside and a second segment extension to LAX.

Metro conducted the Sepulveda Transit Corridor Feasibility Study between 2017 and 2019 that identified three feasible heavy rail alternatives and one feasible monorail alternative between the San Fernando Valley and the Westside. The Board received the findings of the study in 2019 (Legistar File 2019-0759).

The contract for environmental and design services with HTA was awarded i...

Click here for full text