Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.

Meeting Details

Meeting Name: Planning and Programming Committee Agenda status: Final
Meeting date/time: 7/15/2026 11:00 AM Minutes status: Draft  
Meeting location: One Gateway Plaza, Los Angeles, CA 90012, 3rd Floor, Metro Board Room
Watch online: https://boardagendas.metro.net Listen by phone: Dial 888-978-8818 and enter Access Code: 5647249# (English) or 7292892# (Español) To give written or live public comment, please see the top of page 4
Published agenda: Agenda Agenda Accessible Agenda Accessible Agenda Published minutes: Not available  
Agenda packet: Not available
Meeting video: eComment: Not available  
Attachments:
File #Agenda #TypeTitleActionResultAction DetailsAudio
2026-0294 6.ProgramCONSIDER: A. APPROVING the list of eligible SR-710 North Mobility Improvement Projects (MIP) in Attachment A; B. AUTHORIZING the Chief Executive Officer or their designee to: 1. ALLOCATE and program funds to three new MIPs in the City of Monterey Park as recommended in Attachment A; 2. REALLOCATE funds from one existing MIP to another existing MIP in the City of Los Angeles and from one existing MIP to one new MIP and one existing MIP in the City of South Pasadena as recommended in Attachment A; 3. APPROVE associated amendments to the Regional Transportation Improvement Program (RTIP) as shown in Attachment B.   Not available Not available
2026-0441 7.ProgramCONSIDER: A. APPROVING: 1. Programming an additional $4,917,785 within the capacity of Measure M Multi-Year Subregional Program (MSP) - Active Transportation First/Last Mile Connections Program (Expenditure Line 51) and reprogram project funds previously approved to meet the project schedule, as shown in Attachment A; 2. Programming an additional $3,979,932 within the capacity of Measure M MSP - Subregional Equity Program (Expenditure Line 68), as shown in Attachment B; and B. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements and/or amendments for approved projects.   Not available Not available
2026-0454 8.BudgetCONSIDER: A. PROGRAMMING $89,466,188 in Consolidated Appropriations Act of 2026 award funding in support of Planning, Design, and Operations for the 2028 Games; B. AMENDING the FY27 Budget by $89,466,188; and C. AUTHORIZING the CEO or their designee to negotiate and execute all necessary agreements, including pass-through agreements and/or amendments with the agencies for projects contained in the GME FY26 Federal Funding Allocation (Attachment A).   Not available Not available
2026-0103 9.ProjectPROGRAM $6,900,000 for conceptual planning, environmental clearance, preliminary engineering, and community outreach for the San Fernando Valley (SFV)/Pacoima Metrolink Station and Mobility Hub.   Not available Not available
2026-0313 10.ProgramCONSIDER:? A1. APPROVING $125,403,758 $104,403,758 in additional programming within the capacity of Measure R Multimodal Highway Subregional Programs, along with funding changes via the updated project list shown in Attachment A, excluding the WB SR-91 Alondra Blvd to Shoemaker Ave Project; A2. APPROVING $21,000,000 in additional programming within the capacity of Measure R Multimodal Highway Subregional Programs for the WB SR-91 Alondra Blvd to Shoemaker Ave Project, as shown in Attachment A; B. APPROVING the deobligation of $8,573,383 in previously approved Measure R Multimodal Highway Subregional Program funds and re-allocation to other existing Board-approved Measure R Projects or return remaining funds to the Measure R subregional fund balance, as shown in Attachment A; and C. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements for Board-approved projects.   Not available Not available
2026-0406 11.PlanAPPROVE objectives and criteria for the Measure M 10-Year Comprehensive Assessment (Attachment A).   Not available Not available
2026-0385 12.ProjectCONSIDER: A. RECEIVING AND FILING the Environmental Assessment (EA), in accordance with the National Environmental Policy Act (NEPA), including the NEPA project mitigation measures for the Locally Preferred Alternative (LPA), a 4.7-mile Initial Operating Segment to the City of Montebello; B. APPROVING the EA’s 9-acre Maintenance and Storage Facility (MSF) Site 3 in the City of Commerce for the Board-selected Locally Preferred Alternative (LPA), a 4.7-mile Initial Operating Segment extension of the existing Metro E-Line, while maintaining the full nine-mile Eastside Transit Corridor Phase 2 with the Lambert Station in the City of Whittier as the terminus for the Project; and, C. AMENDING the 2020 Long Range Transportation Plan (LRTP) to reflect the Board-selected LPA for the E-Line Eastside Transit Corridor Phase 2 Project.   Not available Not available
2026-0432 13.Motion / Motion ResponseAPPROVE the staff recommendation to provide assistance to local jurisdictions to use Local Return and TDA Article 3 as the only available funding for Open and Slow Street events occurring between September 2026 and March 2028.   Not available Not available
2026-0408 14.Informational ReportRECEIVE AND FILE report on implementation of the Metro Transportation Demand Management (TDM) Master Plan and Policies (Master Plan).   Not available Not available
2026-0029 15.Informational ReportRECEIVE AND FILE status report on Countywide Planning Major Project Status Report.   Not available Not available
2026-0490  Informational ReportRECEIVE General Public Comment   Not available Not available