2026-0638
| 5. | Project | CONSIDER:
A. APPROVING the Locally Preferred Alternative (LPA) for the LA River Path project as Modified Option 2, an 8-mile path between Riverside Drive and Atlantic Boulevard evaluated in the Draft Environmental Impact Report (EIR);
B. APPROVING an approximately 5.5-mile gap closure through two simultaneous Initial Operating Segments (IOS) - the IOS-north between Riverside Drive and Spring Street; and the IOS-South, between Sixth Street and Atlantic Boulevard; and
C. AUTHORIZING staff to work with the City of Los Angeles to bridge the 2.5 mile gap between IOS-north and IOS-south, to prioritize planned Class IV cycle tracks, in combination with the existing on-street bike lanes, which can serve as an interim connection until funding for the off-street river channel paths between Broadway/Spring Street and Sixth Street is secured. | | |
Not available
|
Not available
|
|
2026-0726
| 6. | Program | CONSIDER:
A. APPROVING programming an additional $222,633,182 in Measure M Multi-Year Subregional Program (MSP) - I-605 Corridor “Hot Spot” Interchange Improvements Program (Expenditure Line 61), as shown in Attachment A; and
B. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements and/or amendments for approved projects. | | |
Not available
|
Not available
|
|
2026-0786
| 7. | Plan | APPROVE the project evaluation framework, inclusive of metrics and weighting, for the Measure M 10-Year Comprehensive Assessment (Attachment A). | | |
Not available
|
Not available
|
|
2026-0872
| 8. | Motion / Motion Response | APPROVE Motion by Padilla, Bass, Ayala, Horvath, and Barger that the Board direct the Chief Executive Officer to:
A. Prepare a First/Last Mile plan for the Sun Valley Metrolink Station with a Transit Oriented Development (TOD) Vision study focused on the redevelopment potential of underutilized industrial parcels in Sun Valley and along the San Fernando Road industrial corridor, coordinated with the Brighton to Roxford Double Track Project;
B. Evaluate whether improvements identified for the former Sylmar Light Rail Transit station in the 2020 ESFV Light Rail Transit Project's First/Last Mile plan are applicable to the Sylmar Metrolink Station; based on the results of the Shared Right-of Way Study; and
C. Establish early coordination on the design and construction schedule of the Brighton to Roxford Double Track Project with the California High-Speed Rail Authority's Palmdale to Burbank selected alignment through Sun Valley. Develop recommendations that preserve design flexibility and experience for riders. | | |
Not available
|
Not available
|
|
2026-0799
| 9. | Informational Report | RECEIVE AND FILE status report on the Countywide Planning Major Project Status Report. | | |
Not available
|
Not available
|
|
2026-0826
| | Informational Report | RECEIVE General Public Comment | | |
Not available
|
Not available
|