Please note: this meeting's minutes have not been finalized yet. Actions taken on legislation and their results are not available.

Meeting Details

Meeting Name: Planning and Programming Committee Agenda status: Final
Meeting date/time: 11/18/2026 11:00 AM Minutes status: Draft  
Meeting location: One Gateway Plaza, Los Angeles, CA 90012, 3rd Floor, Metro Board Room
Watch online: https://boardagendas.metro.net Listen by phone: Dial 888-978-8818 and enter Access Code: 5647249# (English) or 7292892# (Español) To give written or live public comment, please see the top of page 4
Published agenda: Agenda Agenda Accessible Agenda Accessible Agenda Published minutes: Not available  
Agenda packet: Not available
Meeting video: eComment: Not available  
Attachments:
File #Agenda #TypeTitleActionResultAction DetailsAudio
2026-0638 5.ProjectCONSIDER: A. APPROVING the Locally Preferred Alternative (LPA) for the LA River Path project as Modified Option 2, an 8-mile path between Riverside Drive and Atlantic Boulevard evaluated in the Draft Environmental Impact Report (EIR); B. APPROVING an approximately 5.5-mile gap closure through two simultaneous Initial Operating Segments (IOS) - the IOS-north between Riverside Drive and Spring Street; and the IOS-South, between Sixth Street and Atlantic Boulevard; and C. AUTHORIZING staff to work with the City of Los Angeles to bridge the 2.5 mile gap between IOS-north and IOS-south, to prioritize planned Class IV cycle tracks, in combination with the existing on-street bike lanes, which can serve as an interim connection until funding for the off-street river channel paths between Broadway/Spring Street and Sixth Street is secured.   Not available Not available
2026-0726 6.ProgramCONSIDER: A. APPROVING programming an additional $222,633,182 in Measure M Multi-Year Subregional Program (MSP) - I-605 Corridor “Hot Spot” Interchange Improvements Program (Expenditure Line 61), as shown in Attachment A; and B. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements and/or amendments for approved projects.   Not available Not available
2026-0786 7.PlanAPPROVE the project evaluation framework, inclusive of metrics and weighting, for the Measure M 10-Year Comprehensive Assessment (Attachment A).   Not available Not available
2026-0872 8.Motion / Motion ResponseAPPROVE Motion by Padilla, Bass, Ayala, Horvath, and Barger that the Board direct the Chief Executive Officer to: A. Prepare a First/Last Mile plan for the Sun Valley Metrolink Station with a Transit Oriented Development (TOD) Vision study focused on the redevelopment potential of underutilized industrial parcels in Sun Valley and along the San Fernando Road industrial corridor, coordinated with the Brighton to Roxford Double Track Project; B. Evaluate whether improvements identified for the former Sylmar Light Rail Transit station in the 2020 ESFV Light Rail Transit Project's First/Last Mile plan are applicable to the Sylmar Metrolink Station; based on the results of the Shared Right-of Way Study; and C. Establish early coordination on the design and construction schedule of the Brighton to Roxford Double Track Project with the California High-Speed Rail Authority's Palmdale to Burbank selected alignment through Sun Valley. Develop recommendations that preserve design flexibility and experience for riders.   Not available Not available
2026-0799 9.Informational ReportRECEIVE AND FILE status report on the Countywide Planning Major Project Status Report.   Not available Not available
2026-0826  Informational ReportRECEIVE General Public Comment   Not available Not available