|
2026-0778
| 16. | Contract | AUTHORIZE the Chief Executive Officer (CEO) to:
A. EXECUTE Modification No. 4 to Communications Support and Outreach Services Bench Contract Nos. PS85397000 through PS85397015 to increase the cumulative contract value in an amount Not-To-Exceed (NTE) $1,500,000, increasing the contract value from $50,000,000 to $51,500,000; and
B. EXECUTE individual contract modifications within the Board-approved contract modification authority. | | |
Not available
|
Not available
|
|
2026-0743
| 17. | Agreement | AUTHORIZE the Chief Executive Officer to execute the Amended Master Cooperative Agreement (MCA) between the City of Los Angeles (City) and the Los Angeles County Metropolitan Transportation Authority (LACMTA, collectively ‘the Parties’), which amends the MCA executed in 2023 (Attachment A). | | |
Not available
|
Not available
|
|
2026-0787
| 18. | Program | CONSIDER:
A. RECEIVING the State and Federal Legislative Report;
B. ADOPTING the proposed 2027 Federal Legislative Program (Attachment A); and
C. ADOPTING the proposed 2027 State Legislative Program (Attachment B). | | |
Not available
|
Not available
|
|
2026-0754
| 19. | Contract | AUTHORIZE the Chief Executive Officer to:
A. EXECUTE Modification No. 14 to Contract No. PS66773HRT with Sepulveda Transit Corridor Partners, LLC (STCP) to provide additional technical services in the amount of $29,645,334.25 for design and project development to advance the approved Sepulveda Transit Corridor Locally Preferred Alternative (LPA), increasing the contract value from $87,353,033.75 to $116,998,368;
B. AUTHORIZE additional Contract Modification Authority (CMA) for Contract No. PS66773HRT in the amount of $2,964,533.43 and authorize the CEO to execute individual Contract Modifications within the Board-approved CMA; and
C. AMEND the adopted FY27 budget to increase non-labor funding for Project #460305 by $26,500,000 from $59,023,199 to $85,523,199. | | |
Not available
|
Not available
|
|
2026-0599
| 20. | Policy | APPROVE the renewal of the Project Labor Agreement (PLA) and Construction Careers Policy (CCP) as amended in Attachments A and B, for a period of 10 years. | | |
Not available
|
Not available
|
|
2026-0638
| 5. | Project | CONSIDER:
A. APPROVING the Locally Preferred Alternative (LPA) for the LA River Path project as Modified Option 2, an 8-mile path between Riverside Drive and Atlantic Boulevard evaluated in the Draft Environmental Impact Report (EIR);
B. APPROVING an approximately 5.5-mile gap closure through two simultaneous Initial Operating Segments (IOS) - the IOS-north between Riverside Drive and Spring Street; and the IOS-South, between Sixth Street and Atlantic Boulevard; and
C. AUTHORIZING staff to work with the City of Los Angeles to bridge the 2.5 mile gap between IOS-north and IOS-south, to prioritize planned Class IV cycle tracks, in combination with the existing on-street bike lanes, which can serve as an interim connection until funding for the off-street river channel paths between Broadway/Spring Street and Sixth Street is secured. | | |
Not available
|
Not available
|
|
2026-0786
| 7. | Plan | APPROVE the project evaluation framework, inclusive of metrics and weighting, for the Measure M 10-Year Comprehensive Assessment (Attachment A). | | |
Not available
|
Not available
|
|
2026-0829
| | Informational Report | RECEIVE General Public Comment | | |
Not available
|
Not available
|