Meeting date/time:
|
9/17/2025
11:00 AM
|
Minutes status:
|
Draft
|
|
Meeting location:
|
One Gateway Plaza, Los Angeles, CA 90012,
3rd Floor, Metro Board Room Watch online: https://boardagendas.metro.net
Listen by phone: Dial 888-978-8818 and enter Access Code:
5647249# (English) or 7292892# (Español)
To give written or live public comment, please see the top of page 4
|
2025-0610
| 5. | Program | CONSIDER:
A. ALLOCATING $11,619,572 in Federal Transit Administration (FTA) Section 5310 - Enhanced Mobility of Seniors and Individuals with Disabilities Program funds to Access Services, as identified by the Federal Fiscal Year (FFY) 2024 and 2025 Funding Allocation Process (Attachment A), for the purchase of replacement vehicles that meet Americans with Disabilities Act (ADA) requirements; and
B. APPROVING the 2025 Solicitation for Proposals (Attachment B) for up to $10,752,739 in FTA Section 5310 competitive funds. | | |
Not available
|
Not available
|
2025-0603
| 6. | Program | CONSIDER:
A. DEOBLIGATING $3.42 million of previously approved Call for Projects (Call) funding, as shown in Attachment A, and held in reserve;
B. APPROVING changes to the scope of work for the City of Los Angeles Traffic Signal Rail Crossing Improvement Project (Call #F9309);
C. REALLOCATING:
1. $2,914,000 Call funds remaining in the City of Los Angeles Burbank Blvd. Widening – Lankershim Blvd. to Cleon Ave. (Call #8046), to the City of Los Angeles: 1) Magnolia Blvd. Widening (North Side) - Cahuenga Blvd. to Vineland Ave. (Call #F7123), and 2) Boyle Heights Chavez Ave. Streetscape Pedestrian Improvements (Call #F3643);
2. $437,200 Call funds in the City of Los Angeles LADOT Streets for People: Parklets and Plazas (Call #F7814), to the City of Los Angeles Boyle Heights Chavez Ave. Streetscape Pedestrian Improvements (Call #F3643);
3. $1,190,000 Call funds in the City of Los Angeles: 1) Main Street Bus Stop and Pedestrian Improvements (Call #F1609), and 2) Main Street Pedestrian Enhancements (Call #F3630), to the City of Los Angeles Magnolia Blvd. Widening (North Si | | |
Not available
|
Not available
|
2025-0604
| 7. | Program | CONSIDER:
A. APPROVING:
1. Programming an additional $36,126,959 within the capacity of Measure M Multi-Year Subregional Program (MSP) – Transportation System and Mobility Improvements Program (Expenditure Line 50), as shown in Attachment A;
2. Programming an additional $23,996,052 within the capacity of Measure M MSP – South Bay Highway Operational Improvements Program (Expenditure Line 63), as shown in Attachment B;
3. Programming an additional $18,372,507 of Measure M MSP – Transportation System and Mobility Improvements Program (Expenditure Line 66), including inter-program borrowing from the Measure M MSP – Transportation System and Mobility Improvements Program (Expenditure Line 50), as shown in Attachment C;
4. Programming an additional $9,452,000 within the capacity of Measure R South Bay Transit Investments Program, shown in Attachment D; and
B. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements and/or amendments for approved projects. | | |
Not available
|
Not available
|
2025-0429
| 8. | Program | CONSIDER:
A. APPROVING project selection for Measure M Metro Active Transport, Transit and First/Last Mile program (MAT Program) funding to 16 projects, as shown in Attachment A;
B. APPROVING an additional $5,000,000 to increase the originally authorized funding for Cycle 2 of the MAT Program from $80,500,000 to $85,500,000; and
C. AUTHORIZING the Chief Executive Officer (CEO) or her designee to negotiate and execute all necessary agreements for approved projects. | | |
Not available
|
Not available
|
2025-0490
| 10. | Informational Report | RECEIVE AND FILE 2025 Short Range Transportation Plan (Attachment A). | | |
Not available
|
Not available
|
2025-0575
| 11. | Informational Report | RECEIVE AND FILE status update on the additional Mid-City technical analysis and community engagement for the K Line Northern Extension (KNE) Project. | | |
Not available
|
Not available
|
2025-0576
| 9. | Agreement | CONSIDER:
A. RECEIVING AND FILING a status update on the California Transportation Commission’s adoption of the 2024 Trade Corridor Enhancement Program (TCEP) discretionary grant awards, including a funding award for Metro’s Long Beach-East Los Angeles (LB-ELA) Corridor Zero-Emission Truck (ZET) Project;
B. AUTHORIZING the Chief Executive Officer (CEO) or their designee to:
1. Program $2,000,000 in Measure R Highway Capital Funds, Line 37, Interstate 710 South and/or Early Action Projects, through the LB-ELA Corridor Mobility Investment Plan (CMIP) as a local match to the TCEP funding award for the Forum Mobility’s FM Hermanas ZET project in Fiscal Years (FYs) 26 & 27;
2. Program $1,000,000 in Measure R Highway Capital Funds, Line 37, Interstate 710 South and/or Early Action Projects, through the LB-ELA CMIP as a local match to the TCEP funding award for the MN8’s Rio Vista ZET project in FY26 & 27;
3. Receive $3,000,000 contribution from the Mobile Source Air Pollution Reduction Review Committee (MSRC) towards both projects; and
4. Negotiate and execute all necessary agreeme | | |
Not available
|
Not available
|
2025-0751
| | Informational Report | RECEIVE General Public Comment | | |
Not available
|
Not available
|
|
|