2025-1062
| 10. | Project | CONSIDER:
A. APPROVING the Locally Preferred Alternative (LPA) as Modified Alternative 5: Heavy rail transit underground between the Van Nuys Metrolink Station and the E Line Expo/Sepulveda Station modified to provide a connection to the Metro G Line and East San Fernando Valley (ESFV) Light Rail Line at Van Nuys Boulevard;
B. AUTHORIZING further design refinement and advancement of the LPA to address project cost, risk, and comments received on the Draft Environmental Impact Report (EIR), including but not limited to defining an Initial Operating Segment (IOS) and a phasing plan with priority given to connecting the San Fernando Valley-at the Metro G Line and ESFV Light Rail Line at Van Nuys Boulevard-and the Westside-at the Metro D Line-including refined maintenance and storage strategy; and
C. AUTHORIZING advancement of the Final EIR and any additional environmental documentation required as a result of selecting the LPA and development of an IOS. | | |
Not available
|
Not available
|
|
2025-0818
| 11. | Project | CONSIDER:
A. APPROVING the Board selected Locally Preferred Alternative (LPA), a 4.5-mile fully grade-separated light rail extension of the C Line Extension to Torrance (now K Line) with two stations in Redondo Beach and Torrance as the Project (Project);
B. CERTIFYING, in accordance with the California Environmental Quality Act (CEQA), the Final Environmental Impact Report (EIR);
C. ADOPTING, in accordance with CEQA, the:
1. Findings of Fact and Statement of Overriding Considerations, and
2. Mitigation, Monitoring and Reporting Program (MMRP); and
D. AUTHORIZING the Chief Executive Officer (CEO) to file a Notice of Determination (NOD) with the Los Angeles County Clerk and the State of California Clearinghouse. | | |
Not available
|
Not available
|
|
2025-0906
| 12. | Program | CONSIDER:?
?
A. APPROVING $59,296,086 in additional programming within the capacity of Measure R Multimodal Highway Subregional Programs, along with funding changes via the updated project list shown in Attachment A. Projects within this Measure R Multimodal Highway Subregional Program include improvements related to traffic signal, pedestrian, bicycle, transit, and roadways;
B. APPROVING the deobligation of $3,371,977 in previously approved Measure R Multimodal Highway Subregional Program funds to re-allocate said funds to other existing Board-approved Measure R Projects or return remaining funds to the Measure R subregional fund balance, as shown in Attachment A; and?
C. AUTHORIZING the Chief Executive Officer (CEO) or their designee to negotiate and execute all necessary agreements for Board-approved Projects. | | |
Not available
|
Not available
|
|
2025-0945
| 13. | Informational Report | RECEIVE AND FILE status report on Countywide Planning Major Project Status Report. | | |
Not available
|
Not available
|
|
2025-1091
| | Informational Report | RECEIVE General Public Comment | | |
Not available
|
Not available
|