File #: 2020-0123   
Type: Contract Status: Passed
File created: 2/3/2020 In control: Construction Committee
On agenda: 6/18/2020 Final action: 6/25/2020
Title: A. AUTHORIZE the Chief Executive Officer to negotiate and execute Contract No. C65322C1194, AMC Site Work and Rail Systems Construction with Hensel Phelps Herzog JV, for the Early Demolition, Preliminary Site Work and Design and Installation of Rail Systems for a term of approximately 24 months within the Not-to-Exceed amount of $21,000,000. B. AUTHORIZE Contract Modification Authority (CMA) specific to Contract No. C65322 C1194 with Hensel Phelps Herzog JV, in correspondence with the executed contract, in the amount of 20% of the final negotiated contract amount.
Sponsors: Construction Committee
Indexes: Airport Metro Connector (AMC) Station Project, Airport Metro Connector Construction (Project), Budgeting, Construction, Contractors, Contracts, Crenshaw/LAX Transit Corridor Project, Crossovers, Division 16, Los Angeles International Airport, Measure R, Metro Crenshaw Line, Metro Exposition Line, Metro Green Line, Metro Rail C Line, Metro Rail E Line, Metro Rail K Line, Procurement, Project, Shoofly, Strategic planning
Attachments: 1. Attachment A - Procurement Summary, 2. Attachment B - DEOD Summary, 3. File Summary
Related files: 2020-0447, 2020-0443
Meeting_Body
CONSTRUCTION COMMITTEE
JUNE 18, 2020

Subject
SUBJECT: AIRPORT METRO CONNECTOR PROJECT

Action
ACTION: APPROVE RECOMMENDATIONS

Heading
RECOMMENDATION

Title

A. AUTHORIZE the Chief Executive Officer to negotiate and execute Contract No. C65322C1194, AMC Site Work and Rail Systems Construction with Hensel Phelps Herzog JV, for the Early Demolition, Preliminary Site Work and Design and Installation of Rail Systems for a term of approximately 24 months within the Not-to-Exceed amount of $21,000,000.

B. AUTHORIZE Contract Modification Authority (CMA) specific to Contract No. C65322 C1194 with Hensel Phelps Herzog JV, in correspondence with the executed contract, in the amount of 20% of the final negotiated contract amount.

Issue
ISSUE

Metro is constructing a new, intermodal station at the connection of the new Crenshaw/LAX (CLAX) Line with the new Airport People Mover (APM) station. The confluence of these three major projects, all in various stages of construction at the same location, is very complicated. In order to minimize delay and disruptions to the new CLAX Line while allowing construction to proceed on the new AMC station, preliminary construction work consisting of demolition, utility work, grading and rail systems design and installation is necessary.
Specifically, the basis of this coordination and work is focused on the construction of a new at-grade light rail station at AMC that will include an entirely new rail platform and track system, two above-grade pedestrian mezzanine crossings and large span canopy roof - all of which will be built within the existing CLAX right of way. Consequently, the construction of these station components will restrict planned CLAX rail service through the AMC project site.
After coordination with Rail Operations and CLAX, the Staff and Project Team analyzed the severity of CLAX service restrictions and originally went through the process of designing a complete Shoofly System. This Shoofly ...