SUBJECT: RESPONSE TO BOARD MOTION REGARDING METRO BLUE LINE STATION & SECURITY ENHANCEMENTS
ACTION: RECEIVE AND FILE
Heading
RECOMMENDATION
Title
RECEIVE AND FILE update for Item 30: Metro Blue Line (MBL) Motion by Mayor Garcetti, Supervisor Knabe, Director Dubois, and Director Dupont-Walker.
Issue
ISSUE
Provide update on all MBL safety, security, and State of Good Repair (SGR) capital projects and enhancement efforts for the following: (1) grade crossing gates, (2) pedestrian safety gates, (3) fare enforcement and security, (4) station maintenance, and (5) station fare gate installation.
MBL Infrastructure Improvement Projects
Beginning in 2010, Metro implemented infrastructure improvements and SGR activities along the MBL system from the north terminus in Los Angeles to the south terminus in the City of Long Beach. Capital improvement projects have and will continue to address safety and security, system improvements and state-of-good repair projects along the MBL alignment. Project funding was allocated to repair aging infrastructure, improve station functionality, passenger comfort and safety and security. Major acquisition and construction projects underway or recently completed include:
State of Good Repair
* Replacement of 20 power substations providing electrical power to trains, stations and all rail systems (Completed 2014)
* Rail replacement and rebooting
* Replacement of life-expired track turnout switches
* Installation of new track crossovers
* Replacement of train control systems
* Replacement and upgrading of Overhead Catenary System (OCS) in Downtown Los Angeles and Long Beach
* Replacement of 69 existing Light Rail Vehicles (LRV) with new P3010 Kinki-Sharyo vehicles
* Power control system back-up battery program
Enhancements
* Station refurbishment (Completed in 2015)
Safety/Security
* Reconstruction and replacement of the Transit Mall track switch at the Long...